Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4,6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 143 pages
Exam (elaborations)

NEVADA C-21B AIR-CONDITIONING CONTRACTOR EXAM- Nevada C-21B Air Conditioning Contractor licensure | Updated Questions & Answers With Rationale A+ Graded| Brand New Release!

Document preview thumbnail
Preview 4 out of 143 pages

Pass the Nevada C-21B Air Conditioning Contractor exam! 250 practice questions with answers and rationales covering HVAC fundamentals, codes, refrigeration, and controls.

Content preview

NEVADA C-21B AIR-CONDITIONING CONTRACTOR EXAM
Nevada C-21B Air Conditioning Contractor licensure
Updated Questions & Answers With Rationale
A+ Graded| Brand New Release!


This comprehensive practice exam consists of 250 multiple-choice questions designed to
assess the knowledge and skills required for the Nevada C-21B Air Conditioning
Contractor license. The C-21B is a limited residential classification issued by the Nevada
State Contractors Board (NSCB) that authorizes the installation, repair, service, and
maintenance of residential air conditioning systems, including related ductwork and
humidity/thermostatic controls. The C-21B is restricted to residential work only and
does not permit commercial HVAC or refrigeration projects. The trade exam is a 60-
question, open-book assessment administered by PSI. A minimum score of 70% is
required to pass, and candidates must also pass the Construction Management Survey
(CMS) exam to obtain a valid Nevada contractor license.

DOMAINS COVERED:
1. Nevada Licensing and Business Law (~10%)
2. HVAC Fundamentals and Thermodynamics (~13%)
3. System Design and Load Calculations (~13%)
4. Mechanical Codes and Standards (~13%)
5. Refrigeration and Refrigerant Management (~10%)
6. Electrical Systems and Controls (~10%)
7. Heating Systems (~10%)
8. Installation, Maintenance, and Repair (~10%)
9. Safety and Project Management (~10%)



Question 1
What is the primary purpose of a disconnect switch within sight of an air
conditioning unit?

,A. To act as a regular operating control
B. To de-energize the unit for safe servicing
C. To protect the compressor from low voltage
D. To reset the circuit breaker remotely


Correct Answer: B
Rationale: The NEC requires a disconnect within sight of the appliance to allow
service personnel to safely lock out the power source.


Question 2
A capacitor labeled "35/5 uF 440V" is typically a:


A. Start Capacitor
B. Run Capacitor
C. Dual Run Capacitor
D. Booster Capacitor


Correct Answer: C
Rationale: The dual rating (35uF and 5uF) indicates it serves two functions, typically
for the compressor (35uF) and the condenser fan motor (5uF).


Question 3
The locking, rotary compressor used in most modern residential AC systems is
powered by:

,A. Single-Phase AC Current
B. Three-Phase AC Current
C. Direct Current (DC)
D. Split-Phase DC Current


Correct Answer: A
Rationale: Residential power is almost exclusively single-phase. Three-phase is more
common in large commercial applications.


Question 4
If a technician measures 0 ohms across a fuse with the power OFF, it indicates the
fuse is:


A. Blown
B. Good
C. Requires more testing
D. The wrong type


Correct Answer: B
Rationale: 0 ohms indicates continuity, meaning the circuit inside the fuse is complete
and unbroken.


Question 5
The LRA (Locked Rotor Amps) of a compressor motor represents:

, A. The normal running current
B. The current draw when the rotor is unable to turn
C. The current at the moment of start
D. The maximum continuous current


Correct Answer: B
Rationale: LRA is the very high current drawn when the motor is energized but not
rotating, which can be 5-7 times higher than the RLA.


Question 6
A potential relay is used to:


A. Protect the compressor from high pressure
B. Remove the start capacitor from the circuit once the motor reaches about 75% of
its rated speed
C. Control the low-voltage thermostat circuit
D. Sense low refrigerant charge


Correct Answer: B
Rationale: Potential relays use back EMF (electromotive force) generated by the
motor itself to open the circuit to the start capacitor.


Question 7
The minimum working clearance in front of a 240V electrical panel, as per NEC, is:

Document information

Uploaded on
September 21, 2026
Number of pages
143
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
R391,44

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ScholarSource
4,8
(198)
Sold
309
Followers
3
Items
1002
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions