CM 4210 MIDTERM QUESTIONS AND CORRECT ANSWERS|
GRADED A+ |VERIFIED ANSWERS|
Residential and building projects are usually designed by Correct
Answers an architect.


Heavy/Highway and industrial projects are usually designed by Correct
Answers an engineer


What type of construction projects usually involve contractor input
Correct Answers design-build (design-construct, construction
management, and design-manage, where team concept prevails. also
negotiated contracts sometimes)


What are the 5 means with which an owner uses in selecting a design
firm? Correct Answers 1. Negotiation with firm of choice
2. Design Competition
3. Submissions from interested designers, with selection based on
professional qualifications alone
4. Submissions that include designation of fees, which become a part of
the evaluation criteria
5. Bids for professional services and selection on the basis of price alone


What are the 5 basic services of the architect? Correct Answers 1.
Ascertaining the needs and desires of the owner
2. Developing the design
3. preparing the bid or negotiation documents

,4. Aiding in the selection of the contractor
5. Making an estimate of the construction costs


What are the 6 options for compensation structure of the A/E? Correct
Answers 1. Percentage of construction cost(most used)
2. Multiple of salary cost
3. Multiple of salary cost plus non-salary expense
4. fixed lump-sum
5. Total expense plus professional fee(a form of cost-plus)
6. Hourly per diem charge


In what phase of the construction project does the A/E act as on
independent contractor? Correct Answers Design


When can third-party liability of an A/E arise? Correct Answers If
bodily injury or property damage is caused by the negligence or failure
in the duty of the designer


When does liability for negligence lawsuits arise? Correct Answers At
substantial completion or acceptance of the work by the owner


Name the 6 areas where a contractor may provide input during design:
Correct Answers 1. Labor availability and costs
2. Material availability
3. Alternative methods and procedures

,4. Delivery times
5. Local work practices
6. General site planning


What three important functions do the drawings and specifications
serve? Correct Answers 1. The nature and extent of the construction to
be done
2. the materials to be provided
3. the quality of the workmanship


What is the purpose of an Advertisement for Bids? Correct Answers
Public notice to all contractors that those interested(and qualified) are
being sought to submit proposals for construction of a project


What is an invitation to bid? Correct Answers Notification to
preselected contractors to submit a proposal on a project


What is a project manual? Correct Answers Bid and contract documents
altogether in one book


What is the purpose of the instructions to bidders? Correct Answers To
make sure all bidders are bidding exactly under the same conditions


The Conditions of the Contract define and describe what? Correct
Answers The administrative and operational elements of the contract

, What are the 7 typical sections of the drawings? Correct Answers 1. Plot
plan, 2. foundation, 3. architectural, 4. structural, 5. electrical, 6.
mechanical, 7. and plumbing


What are open specifications? Correct Answers Descriptions of
characteristics and attributes of material and equipment to be
incorporated in the project in generic terms which establish quality
required in the material by the designer


What are closed specifications? Correct Answers When the quality
requirement established by the designer is established by listing a
specific brand-identified project.


What is a Base-Bid Specification? Correct Answers The contract
documents name products to be used in the base bid, but the contractors
can offer alternate items


What is an addendum? Correct Answers A modification to the bid
documents or to the contract documents issued by the designer during
the bidding period


What is a Owner-Designated Alternative? Correct Answers Alternate
materials or methods included within the original contract documents to
provide a means for the owner to consider different alternatives to the
original design to include or not as decided by the owner.

Document information

Uploaded on
May 26, 2026
Number of pages
37
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
R299,94

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker
3,8
(401)
Sold
2167
Followers
1346
Items
50099
Last sold
11 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions