QUESTIONS & ANSWERS
The only way to create an Xactimate estimate is through XactAnalysis. - ANSWERFalse
With an Internet connection, you can download and upload a XactAnalysis assignment.
- ANSWERTrue
What are the steps in the 4-Step Estimating Process? - ANSWER1.Claim Info
2.Sketch
3.Estimate Items
4.Complete
It is mandatory to follow the 4-Step Estimating Process in its exact order. -
ANSWERFalse
At the fundamental level of learning, it is recommended to add or create a project from
the Control Center tab. - ANSWERFalse
Multiple addresses can be added through Insured Info. - ANSWERTrue
There are three coverage types available in the Coverage/Loss section. Name them -
ANSWERa. Dwelling
b. Other Structures
c. Contents
A deductible can be applied across all coverages or specific coverage only -
ANSWERTrue
Xactware surveys prices from contractors in the field. The unit prices the contractors
provide are ______________ of costs and fees associated with performing the task, but
____________ of any general overhead and profit percentage. - ANSWERinclusive,
exclusive
Image types that can be imported into a Company Header includes .tif, .gif, and .png. -
ANSWERFalse
What does a number in parentheses represent when it follows a room name? e.g.,
Closet (1) - ANSWERSubgroup
The Undo button can only be used twice. - ANSWERFalse
The variable PF stands for floor perimeter. - ANSWERTrue