100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NACE CIP 2 Practice Exam

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
03-11-2025
Written in
2025/2026

NACE CIP 2 Practice Exam

Institution
Coating Inspector
Course
Coating inspector










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Coating inspector
Course
Coating inspector

Document information

Uploaded on
November 3, 2025
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NACE CIP 2 Practice Exam

You are the NACE Coating Inspector on a tank lining project and are asked to perform a
high voltage holiday test after the coating applicators have completed their final repairs.
After meeting all the confined space entry permit you enter the tank and notice a very
strong odor of solvent Your first course of action should to:
a) Investigate to find the source of the odor
b) Don your air supplied respirator and continue the testing
c) Exit the tank immediately and report the problem to the nearest safety supervisor
d) Exit the tank and document the incident in your daily report - answersc) Exit the tank
immediately and report the problem to the nearest safety supervisor

You are working as an inspector in a galvanizing plant for the first time.
What are some of the hazards you need to be aware of:
a) Risk of chemical exposure
b) Risk of skin
c) Risk of acid or caustic splashes
d) a), b), and c) - answersd) a), b), and c)

You are working as the only in-house NACE Level 2 Inspector in a shop setting when
an independent 3d party NACE Level 3 Inspector, representing the owner, presents you
with a copy of a Non-Conformance Report (NCR) he has written for a NACE/SSPC SP
10 centrifugal blast which you had previously approved.
Your FIRST preferred course of action is to:
a) Verbally challenge the NCR
b) Request a re-blast of the item in question
c) Consult your supervisor
d) Review the NCR with the other Inspector - answersc) Consult your supervisor

An Inspection and Test Plan is required when:
a) It is always required
b) When the Coating Applicator requests one
c) When the Owner specifies one
d) When the Inspector requests one - answersa) it is always required

The Inspectors' goal at the Pre-Job Conference is to:
a) Obtain a clear understanding of the Specification
b) Discuss contractual requirements
c) Manage the meeting so it doesn't go off topic
d) Take accurate meeting minutes for distribution - answersa) Obtain a clear
understanding of the specification

,Coating Surveys are legally required:
a) On commercial marine vessels and offshore platforms
b) On high pressure gas lines and fireproofed structures
c) On water tanks and potable water pipelines
d) On food and beverage vessels and can linings - answersa) On commercial marine
vessels and offshore platforms

Individuals conducting Coating Surveys should:
a) Always be NACE Level 3 Certified Inspectors
b) Always be NACE or SSPC Protective coating Specialists
c) Always be experienced Specification Writers
d) Always be trained and experienced in the Coating Industry - answersd) Always be
trained and experienced in the Coating Industry

The cost of qualified Coating Inspection is normally offset by:
a) Lower Application Costs
b) Lower Coating Life Cycle Costs
c) Lower Safety Enforcement Costs
d) Lower Supervision Costs - answersb) Lower Coating Life Cycle Costs

You are a NACE Level 2 Coating Inspector who has just arrived on a job in progress
where there is no inspection and Test Plan (ITP). The first morning you arrive the job is
behind schedule, and you are asked to take DIY Film Thickness readings.
Your FIRST preferred course of action is to:
a) Refuse to take readings until an is in place
b) Develop your own methodology and proceed take the readings
c) Use a generally accepted industry standard and to take readings
d) Call your supervisor - answersc) Use a generally accepted industry standard and to
take readings

When conducting inspections, the Inspector should follow which standards:
a) NACE and SSPC standards in North America
b) ISO standards in Europe and Asia
c) Australian standards in Australia
d) The specified standards - answersd) The specified standards

You are the NACE Level 2 Coating Inspector where SSPC PA 2 has been specified with
an additional requirement that no individual gauge reading shall be below a certain
value. As this is not part of the standard you should:
a) Ignore the additional requirement
b) Enforce the additional requirement
c) Call your supervisor
d) Request clarification from the specifier - answersb) Enforce the additional
requirement

, The coating applicator has ignored a enface preparation hold point and applied coating
over the surface without a sign off from you as the inspector.
Your FIRST preferred course of action is to:
a) Stop the job
b) Require the Applicator to remove the coating
c) Advise the Owner and write a Non-Conformance report
d) Ignore the situation - answersb) Require the Applicator to remove the coating

In the event of a conflict between the Product Data Sheet and the Specification:
a) The Product Data Sheet prevails
b) The Specification prevails
c) It is up to the Inspector to decide which one to follow
d) It is up to the Applicator to decide which one to follow - answersb) The Specification
prevails

From a corrosion perspective, the main difference between Ferrous and Non-Ferrous
Metals is:
a) Cost
b) Iron content
c) Appearance
d) Safety - answersb) Iron content

You are the NACE Coating Inspector on a tank lining project where desiccant
dehumidification is being used. Since the first shift of abrasive blasting your readings
have indicated relative humidity below 40%; however, on the second shift of coating
application your readings are indicting 80%.
Your FIRST preferred course of action is to:
a) Check to See if the dehumidification equipment is operating correctly
b) Call your supervisor
c) Advise the coating applicator supervisor of your readings
d) Document the readings at the end of the shift - answersc) Advise the coating
applicator supervisor of your readings

When environmental enclosures are being used an inspector needs to be concerned
about:
a) Lighting
b) Air changes
c) Structural integrity
d) a), b), and c) - answersd) a), b), and c)

lt is always possible to see moisture on a steel substrate:
a) True
b) False - answersb) False

When observing design defects, the NACE Inspector should:
a) Document the defect and the potential problems that could result
CA$24.52
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SALVADO Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
15
Member since
2 year
Number of followers
7
Documents
2693
Last sold
2 months ago
RWARAKA

IN MY SHOP WE OFFER TEST BANK, EXAMS,ESSY ,STUDY CASE AND ALL TYPES OF EXAMS

3.0

1 reviews

5
0
4
0
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions