ICC Soils General (GR) Part 3 Q & A A SI does not need basic knowledge of - Correct Answer - structural design What is not required of the SI prior to arriving on site - Correct Answer - Meet with contractor Which of the following circumstances warrants contacting the contractor immediately: - Correct Answer - the concrete temperature is over 90 degrees F Who is responsible for reviewing and approving special inspection reports? - Correct Answer - the Building Official (BO) The reports of a technical finding are approved by... - Correct Answer - the Building Official (BO) The statement of special inspections is prepared by the ____ and approved by the ___. - Correct Answer - RDP; BO Which of the following is used to approve a building material not listed in the IBC - Correct Answer - a technical evaluation Who performs structural observations? - Correct Answer - RDP When should the SI immediately notify the contractor? - Correct Answer - When the rebar is not tied correctly A preconstruction meeting is generally conducted by the - Correct Answer - RDP Which of the following does not need to be put in a special inspection report? - Correct Answer - time of inspection The contractor signs a statement of - Correct Answer - responsibility Who signs the special inspection agreement? - Correct Answer - Owner, Special Inspector, and the Contractor Who hires the contractor? - Correct Answer - The owner When can inspections of fabricators be waived? - Correct Answer - When approved by the BO Who is allowed to hire the special inspector? - Correct Answer - RDP and Owner Who administers the special inspection program? - Correct Answer - the Building Department

Show more Read less
Institution
ICC REINFORCED CONCRETE
Course
ICC REINFORCED CONCRETE








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ICC REINFORCED CONCRETE
Course
ICC REINFORCED CONCRETE

Document information

Uploaded on
May 21, 2025
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ICC Soils General (GR) Part 3 Q & A
A SI does not need basic knowledge of - Correct Answer - structural design

What is not required of the SI prior to arriving on site - Correct Answer - Meet with contractor

Which of the following circumstances warrants contacting the contractor immediately: - Correct
Answer - the concrete temperature is over 90 degrees F

Who is responsible for reviewing and approving special inspection reports? - Correct Answer -
the Building Official (BO)

The reports of a technical finding are approved by... - Correct Answer - the Building Official (BO)

The statement of special inspections is prepared by the ____ and approved by the ___. -
Correct Answer - RDP; BO

Which of the following is used to approve a building material not listed in the IBC - Correct
Answer - a technical evaluation

Who performs structural observations? - Correct Answer - RDP

When should the SI immediately notify the contractor? - Correct Answer - When the rebar is not
tied correctly

A preconstruction meeting is generally conducted by the - Correct Answer - RDP

Which of the following does not need to be put in a special inspection report? - Correct Answer -
time of inspection

The contractor signs a statement of - Correct Answer - responsibility

Who signs the special inspection agreement? - Correct Answer - Owner, Special Inspector, and
the Contractor

Who hires the contractor? - Correct Answer - The owner

When can inspections of fabricators be waived? - Correct Answer - When approved by the BO

Who is allowed to hire the special inspector? - Correct Answer - RDP and Owner

Who administers the special inspection program? - Correct Answer - the Building Department
CA$12.15
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
gurutech

Get to know the seller

Seller avatar
gurutech Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
7 months
Number of followers
0
Documents
63
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions