Voice-Data-Video System Drawings and Specifications- Exam Questions and Correct Solutions (Already Passed) Chapter 1: Project Professionals, Design Phases, and the Construction Process A typical commercial construction project begins with a( n ) __________ seeking to develop a new or existing property to meets specific needs. A. Architect B. Engineer C. General Contractor ( GC ) D. Owner - Answers Owner Chapter 1: Project Professionals, Design Phases, and the Construction Process The __________ is responsible for all inspections, the final building occupancy approval sign-off, and the commissioning of all building systems. A. Architect B. Engineer C. General Contractor ( GC ) D. Owner - Answers General Contractor ( GC ) Chapter 1: Project Professionals, Design Phases, and the Construction Process The __________ phase gives the owner the first opportunity to see the potential design and get an approximation of the costs A. Bidding B. Construction document C. Design development D. Schematic design - Answers Schematic design Chapter 1: Project Professionals, Design Phases, and the Construction Process The __________ are the fully completed design that complies with building codes and industry standards and are ready for bidding and, ultimately, the construction of the facility A. Addendum B. Construction documents C. Drawings D. Specifications - Answers Construction documents Chapter 1: Project Professionals, Design Phases, and the Construction Process The bidding method is often used for the electrical and VDV system portions of a project. A. Competing B. Cost-plus C. Labor-only D. Negotiated/design-assist - Answers Labor-only Chapter 1: Project Professionals, Design Phases, and the Construction Process The __________ bidding method can often save time, provide flexibility, and avoid the risk of removing completed or partially completed work and starting over. A. Competitive B. Cost-plus C. Labor-only D. Negotiated/design-assist - Answers Cost-plus Chapter 1: Project Professionals, Design Phases, and the Construction Process Most often, the product selection for private work is specified by __________. A. Cost B. Industry standards C. Specific OEMs D. Performance - Answers Specific OEMS Chapter 1: Project Professionals, Design Phases, and the Construction Process A( n ) __________ is a document that project managers use to resolve conflicts early in the process to attempt to eliminate costly corrective measures A) Addendum B) Construction change directive C) Punch list D) Request for information ( RFI ) - Answers Request for information ( RFI ) Chapter 1: Project Professionals, Design Phases, and the Construction Process A( n ) __________ is typically used to provide clarification and small changes, such as slightly altering locations or dimensions on a print. A) Addendum B) Architect's supplemental instruction ( ASI ) C) Construction change directive D) Request for information ( RFI ) - Answers Architect's supplemental instruction ( ASI ) Chapter 1: Project Professionals, Design Phases, and the Construction Process The end of the construction process includes a( n ) __________ generated by the architect and the architect's design team outlining work. That remains to be completed, work not installed as specified, and work requiring adjustment or needing to be cleaned. A) Addendum B) Application assurance warranty C) Architect's supplemental instruction D) Punch list - Answers Punch list Chapter 1: Project Professionals, Design Phases, and the Construction Process A professional engineer ( PE ) is an individual or commercial firm that specializes in a particular trade or field of construction. True or False - Answers False Chapter 1: Project Professionals, Design Phases, and the Construction Process Many OEMS typically provide warranties for VDV systems for a period of 5 years to 25 years True or False - Answers True Chapter 1: Project Professionals, Design Phases, and the Construction Process OEM-standardized VDV systems are also known as "proprietary systems." True or false - Answers True Chapter 1: Project Professionals, Design Phases, and the Construction Process The most common method for bidding on a project from a contractor's perspective is the labor-only method True or false - Answers False - It's the least common method Chapter 1: Project Professionals, Design Phases, and the Construction Process The owner of a project determines the parameters of the necessary building space based on items such as property size and shape, desired interior and exterior spaces, and available project budget. True or False - Answers False Chapter 1: Project Professionals, Design Phases, and the Construction Process __________ is the initial design phase that defines the general scope and conceptual design of a project. A) Schematic design B) Drawing development C) Coordination of requirements D) Design development - Answers Schematic design Chapter 1: Project Professionals, Design Phases, and the Construction Process __________ is the practice of constructing a building using processes that are environmentally responsible and resource-efficient throughout the life cycle of the building. A) Sustainable building B) Design building C) Fast-track building D) BIM building - Answers Sustainable building Chapter 1: Project Professionals, Design Phases, and the Construction Process __________ is the process of taking an abstract idea and developing it into a working solution. A) Design B) Drafting C) Drawing D) Documenting - Answers Design Chapter 1: Project Professionals, Design Phases, and the Construction Process __________ signage is commonly found in lobbies of commercial buildings and provides a campus map or a building floor plan. A) illuminated B) Wayfinding C) Directory D) Information - Answers Wayfinding Chapter 1: Project Professionals, Design Phases, and the Construction Process An__________ would be best served by a cost-effective generic VDV system.

Show more Read less
Institution
Voice-Data-Video System Drawings And Specification
Course
Voice-Data-Video System Drawings and Specification











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Voice-Data-Video System Drawings and Specification
Course
Voice-Data-Video System Drawings and Specification

Document information

Uploaded on
January 2, 2025
Number of pages
44
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Voice-Data-Video System Drawings and Specifications- Exam Questions and Correct Solutions (Already
Passed)



Chapter 1: Project Professionals, Design Phases, and the Construction Process



A typical commercial construction project begins with a( n ) __________ seeking to develop a new or
existing property to meets specific needs.



A. Architect

B. Engineer

C. General Contractor ( GC )

D. Owner - Answers Owner

Chapter 1: Project Professionals, Design Phases, and the Construction Process



The __________ is responsible for all inspections, the final building occupancy approval sign-off, and the
commissioning of all building systems.



A. Architect

B. Engineer

C. General Contractor ( GC )

D. Owner - Answers General Contractor ( GC )

Chapter 1: Project Professionals, Design Phases, and the Construction Process



The __________ phase gives the owner the first opportunity to see the potential design and get an
approximation of the costs



A. Bidding

,B. Construction document

C. Design development

D. Schematic design - Answers Schematic design

Chapter 1: Project Professionals, Design Phases, and the Construction Process



The __________ are the fully completed design that complies with building codes and industry
standards and are ready for bidding and, ultimately, the construction of the facility



A. Addendum

B. Construction documents

C. Drawings

D. Specifications - Answers Construction documents

Chapter 1: Project Professionals, Design Phases, and the Construction Process



The bidding method is often used for the electrical and VDV system portions of a project.



A. Competing

B. Cost-plus

C. Labor-only

D. Negotiated/design-assist - Answers Labor-only

Chapter 1: Project Professionals, Design Phases, and the Construction Process



The __________ bidding method can often save time, provide flexibility, and avoid the risk of removing
completed or partially completed work and starting over.



A. Competitive

,B. Cost-plus

C. Labor-only

D. Negotiated/design-assist - Answers Cost-plus

Chapter 1: Project Professionals, Design Phases, and the Construction Process



Most often, the product selection for private work is specified by __________.



A. Cost

B. Industry standards

C. Specific OEMs

D. Performance - Answers Specific OEMS

Chapter 1: Project Professionals, Design Phases, and the Construction Process



A( n ) __________ is a document that project managers use to resolve conflicts early in the process to
attempt to eliminate costly corrective measures



A) Addendum

B) Construction change directive

C) Punch list

D) Request for information ( RFI ) - Answers Request for information ( RFI )

Chapter 1: Project Professionals, Design Phases, and the Construction Process



A( n ) __________ is typically used to provide clarification and small changes, such as slightly altering
locations or dimensions on a print.



A) Addendum

, B) Architect's supplemental instruction ( ASI )

C) Construction change directive

D) Request for information ( RFI ) - Answers Architect's supplemental instruction ( ASI )

Chapter 1: Project Professionals, Design Phases, and the Construction Process



The end of the construction process includes a( n ) __________ generated by the architect and the
architect's design team outlining work. That remains to be completed, work not installed as specified,
and work requiring adjustment or needing to be cleaned.



A) Addendum

B) Application assurance warranty

C) Architect's supplemental instruction

D) Punch list - Answers Punch list

Chapter 1: Project Professionals, Design Phases, and the Construction Process



A professional engineer ( PE ) is an individual or commercial firm that specializes in a particular trade or
field of construction.



True or False - Answers False

Chapter 1: Project Professionals, Design Phases, and the Construction Process



Many OEMS typically provide warranties for VDV systems for a period of 5 years to 25 years



True or False - Answers True

Chapter 1: Project Professionals, Design Phases, and the Construction Process



OEM-standardized VDV systems are also known as "proprietary systems."

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
368
Member since
1 year
Number of followers
16
Documents
29736
Last sold
1 day ago
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

59 reviews

5
21
4
15
3
12
2
0
1
11

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions