Voice-Data-Video System Drawings and
Specifications|2024-2025 latest
|COMPREHENSIVE MOST TESTED (frequently
tested) QUESTIONS AND VERIFIED ANSWERS |
GET IT 100% ACCURATE!!
Terms in this set (164)
Chapter 1: Project Owner
Professionals, Design
Phases, and the
Construction Process
A typical commercial
construction project
begins with a( n ) __________
seeking to develop a new
or existing property to
meets specific needs.
A. Architect
B. Engineer
C. General Contractor (
GC )
D. Owner
https://quizlet.com/965496815/voice-data-video-system-drawings-and-specifications2024-2025-latest-comprehensive-most-tested-frequently-test… 1/41
,11/1/24, 7:51 PM Voice-Data-Video System Drawings and Specifications|2024-2025 latest |COMPREHENSIVE MOST TESTED (frequently teste…
Chapter 1: Project General Contractor ( GC )
Professionals, Design
Phases, and the
Construction Process
The __________ is responsible
for all inspections, the
final building occupancy
approval sign-off, and
the commissioning of all
building systems.
A. Architect
B. Engineer
C. General Contractor (
GC )
D. Owner
Chapter 1: Project Schematic design
Professionals, Design
Phases, and the
Construction Process
The __________ phase gives
the owner the first
opportunity to see the
potential design and get
an approximation of the
costs
A. Bidding
B. Construction
document
C. Design development
D. Schematic design
https://quizlet.com/965496815/voice-data-video-system-drawings-and-specifications2024-2025-latest-comprehensive-most-tested-frequently-test… 2/41
,11/1/24, 7:51 PM Voice-Data-Video System Drawings and Specifications|2024-2025 latest |COMPREHENSIVE MOST TESTED (frequently teste…
Chapter 1: Project Construction documents
Professionals, Design
Phases, and the
Construction Process
The __________ are the fully
completed design that
complies with building
codes and industry
standards and are ready
for bidding and,
ultimately, the
construction of the
facility
A. Addendum
B. Construction
documents
C. Drawings
D. Specifications
Chapter 1: Project Labor-only
Professionals, Design
Phases, and the
Construction Process
The bidding method is
often used for the
electrical and VDV
system portions of a
project.
A. Competing
B. Cost-plus
C. Labor-only
D. Negotiated/design-
assist
https://quizlet.com/965496815/voice-data-video-system-drawings-and-specifications2024-2025-latest-comprehensive-most-tested-frequently-test… 3/41
, 11/1/24, 7:51 PM Voice-Data-Video System Drawings and Specifications|2024-2025 latest |COMPREHENSIVE MOST TESTED (frequently teste…
Chapter 1: Project Cost-plus
Professionals, Design
Phases, and the
Construction Process
The __________ bidding
method can often save
time, provide flexibility,
and avoid the risk of
removing completed or
partially completed work
and starting over.
A. Competitive
B. Cost-plus
C. Labor-only
D. Negotiated/design-
assist
Chapter 1: Project Specific OEMS
Professionals, Design
Phases, and the
Construction Process
Most often, the product
selection for private work
is specified by __________.
A. Cost
B. Industry standards
C. Specific OEMs
D. Performance