Project Management Procore Certification
True or False: If you have a project with more than one building or area, you
should enable the "Drawings by Area" feature. - CORRECT ANSWER-True
True or False: It's important to discuss best practices in formatting your drawings
with the design Team to ensure that the drawings are seamlessly processed in
Procore. - CORRECT ANSWER-True
True or False: When you click a project's Drawings tool in the Procore web app,
you should expect to see the project's "current set" of drawings. (i.e. The most
recently uploaded revision of each drawing.) - CORRECT ANSWER-True
How can you draw a straight line while marking up your drawing? - CORRECT
ANSWER-Hold shift key when drawing a line
Who can view drawing markups on your 'Personal' layer? - CORRECT
ANSWER-Only You
True or False: When you add a markup to a drawing, any markups will be
immediately available to your team without further action on your part. -
CORRECT ANSWER-False
True or False: You can now have your Design Team upload drawings directly to
the Drawings tool without having the drawings be published immediately. -
CORRECT ANSWER-True
You should upload shop drawings to Procore's Drawings tool. - CORRECT
ANSWER-False
True or False: Procore automatically sends an email to users with 'Admin'
permissions on the Drawings tool when new drawings have been uploaded and
are ready to be reviewed and published. - CORRECT ANSWER-True
What is an important best practice you should communicate to the Design Team
about the formatting of the spec book?
, a. The table of contents should be in the first 25 pages of the spec book
b. The spec section number and description should be in the header and footer
of every page
c. There shouldn't be any other string of numbers that looks like a spec section
number in the header and footer of the page (e.g. a project ID)
d. All of the above - CORRECT ANSWER-d. All of the above
True or False: Before you publish your spec book to the team, you should make
sure there's a break between every spec section. - CORRECT ANSWER-True
True or False: To upload a revision to your spec book, you will first need to delete
the old version from Procore. - CORRECT ANSWER-False
Why are some action buttons inactive and gray?
a. Because the action is no longer supported by Procore's application
b. Because an 'Admin' user manually disabled the action
c. Because certain actions require that you first select one or more spec sections
before the button becomes active and orange (i.e. clickable)
d. Because another user has already performed that action - CORRECT
ANSWER-c. Because certain actions require that you first select one or more
spec sections before the button becomes active and orange (i.e. clickable)
True or False: When you delete a specification from the Specifications list page,
you will delete the specification and all of its revisions. - CORRECT
ANSWER-False
In Procore, what does it mean if a field has a blue caret in the top corner of the
cell?
a. The field is editable in-line
b. The field has been marked for review by a 'Standard' level user
c. The item is overdue
d. The item has a comment attached to it - CORRECT ANSWER-a. The field is
editable in-line
Question 7 of 10
Which action are you UNABLE to perform from the PDF viewer of a spec
section?
True or False: If you have a project with more than one building or area, you
should enable the "Drawings by Area" feature. - CORRECT ANSWER-True
True or False: It's important to discuss best practices in formatting your drawings
with the design Team to ensure that the drawings are seamlessly processed in
Procore. - CORRECT ANSWER-True
True or False: When you click a project's Drawings tool in the Procore web app,
you should expect to see the project's "current set" of drawings. (i.e. The most
recently uploaded revision of each drawing.) - CORRECT ANSWER-True
How can you draw a straight line while marking up your drawing? - CORRECT
ANSWER-Hold shift key when drawing a line
Who can view drawing markups on your 'Personal' layer? - CORRECT
ANSWER-Only You
True or False: When you add a markup to a drawing, any markups will be
immediately available to your team without further action on your part. -
CORRECT ANSWER-False
True or False: You can now have your Design Team upload drawings directly to
the Drawings tool without having the drawings be published immediately. -
CORRECT ANSWER-True
You should upload shop drawings to Procore's Drawings tool. - CORRECT
ANSWER-False
True or False: Procore automatically sends an email to users with 'Admin'
permissions on the Drawings tool when new drawings have been uploaded and
are ready to be reviewed and published. - CORRECT ANSWER-True
What is an important best practice you should communicate to the Design Team
about the formatting of the spec book?
, a. The table of contents should be in the first 25 pages of the spec book
b. The spec section number and description should be in the header and footer
of every page
c. There shouldn't be any other string of numbers that looks like a spec section
number in the header and footer of the page (e.g. a project ID)
d. All of the above - CORRECT ANSWER-d. All of the above
True or False: Before you publish your spec book to the team, you should make
sure there's a break between every spec section. - CORRECT ANSWER-True
True or False: To upload a revision to your spec book, you will first need to delete
the old version from Procore. - CORRECT ANSWER-False
Why are some action buttons inactive and gray?
a. Because the action is no longer supported by Procore's application
b. Because an 'Admin' user manually disabled the action
c. Because certain actions require that you first select one or more spec sections
before the button becomes active and orange (i.e. clickable)
d. Because another user has already performed that action - CORRECT
ANSWER-c. Because certain actions require that you first select one or more
spec sections before the button becomes active and orange (i.e. clickable)
True or False: When you delete a specification from the Specifications list page,
you will delete the specification and all of its revisions. - CORRECT
ANSWER-False
In Procore, what does it mean if a field has a blue caret in the top corner of the
cell?
a. The field is editable in-line
b. The field has been marked for review by a 'Standard' level user
c. The item is overdue
d. The item has a comment attached to it - CORRECT ANSWER-a. The field is
editable in-line
Question 7 of 10
Which action are you UNABLE to perform from the PDF viewer of a spec
section?