Procore Final Exam
What is an important best practice you should communicate to the Design team
about the formatting of the spec book?
a. The table of contents should be in the first 20 pages of the spec book
b. The spec section number and description should be in the header and footer
of every page
c. There should not be any text that looks like a spec section number in the
header or footer of the page
d. All of the above - CORRECT ANSWER-d. All of the above
True or False: To upload a revision to your spec book, you will first need to delete
the old version from Procore. - CORRECT ANSWER-False
Why are some action buttons inactive and gray? - CORRECT
ANSWER-Because certain actions require that you first select one or more spec
sections before the button becomes orange/clickable
In Procore, what does it mean if there is a blue caret in a field? - CORRECT
ANSWER-The field is editable in-line
True or False: If you have a project with more than one building or area, you
should enable the "Drawings by Area" feature. - CORRECT ANSWER-True
True or False: When you click a project's Drawings tool, you should expect to see
the project's "current set" of drawings. (i.e. The most recently uploaded revisions
of each drawing.) - CORRECT ANSWER-True
If you see this icon next to a drawing, what does it mean?
square & triangle - CORRECT ANSWER-The drawing contains manually added
markups
If you see this icon next to a drawing, what does it mean?
SK - CORRECT ANSWER-The drawing has sketches associated with it
What is an important best practice you should communicate to the Design team
about the formatting of the spec book?
a. The table of contents should be in the first 20 pages of the spec book
b. The spec section number and description should be in the header and footer
of every page
c. There should not be any text that looks like a spec section number in the
header or footer of the page
d. All of the above - CORRECT ANSWER-d. All of the above
True or False: To upload a revision to your spec book, you will first need to delete
the old version from Procore. - CORRECT ANSWER-False
Why are some action buttons inactive and gray? - CORRECT
ANSWER-Because certain actions require that you first select one or more spec
sections before the button becomes orange/clickable
In Procore, what does it mean if there is a blue caret in a field? - CORRECT
ANSWER-The field is editable in-line
True or False: If you have a project with more than one building or area, you
should enable the "Drawings by Area" feature. - CORRECT ANSWER-True
True or False: When you click a project's Drawings tool, you should expect to see
the project's "current set" of drawings. (i.e. The most recently uploaded revisions
of each drawing.) - CORRECT ANSWER-True
If you see this icon next to a drawing, what does it mean?
square & triangle - CORRECT ANSWER-The drawing contains manually added
markups
If you see this icon next to a drawing, what does it mean?
SK - CORRECT ANSWER-The drawing has sketches associated with it