100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Oregon Construction Contractors CCB Test 2022 (verified answers)

Rating
5.0
(3)
Sold
7
Pages
57
Grade
A+
Uploaded on
26-08-2022
Written in
2022/2023

Oregon Construction Contractors CCB Test 2022 (verified answers)

Institution
NHIE
Course
NHIE











Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
August 26, 2022
Number of pages
57
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Oregon Construction Contractors CCB
Test 2022 (verified answers)

A person who engages in a business or activity that involves construction new water
wells must possess a license from the: ANS:- Oregon Water Resource Department
(OWRD)


True or False
Prompt billing and prompt collections make for a healthier cash flow. ANS:- True


Oregon OSHA consultants WILL NOT: ANS:- Issue citations or propose penalties for
violations of OSHA standards.


1) Questions to answer when preparing your project schedule include all of these
except:


- All of these are questions to ask
- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity? ANS:- - All of these are
questions to ask
- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity?


For Notice of Right Lien purpose, a commercial improvement is defined as: ANS:- A
structure that is not used or intended for use as a residential building


I am the residential original contractor and I provide labor and materials for the
project. Who do I need to give a notice of Right to Lien to? ANS:- Mortgagee

,A quantity survey is also referred to as a: ANS:- Take Off


Tagout involves placing a warning tag: ANS:- On an energy-isolation device


Other than Take Off, other common construction estimate types include all, except:
ANS:- Ballpark Estimates


True or False
An on-site of host employer is responsible for ensuring a safe place of employment
for leased or temporary workers. ANS:- True


The state unemployment tax rate varies base on: ANS:- The history of
unemployment claims against the employer.


Stop work order violations can result in: ANS:- - Any of these could be the result of
failure to comply with a stop work order.
- Court action
- Permit or license revocation
- Civil penalties


The ___________________ gives an overview of the project, deadlines, and general
requirements. ANS:- Invitation to Bid


"Job Logic" refers to: ANS:- The sequence of work


True or False
Self-employment taxes apply to all forms of business entities. ANS:- False


- Money earned and money spent are accounted for in the year they are received or
paid, respectively. ANS:- In the Cash Method


The Itemized Summary is the basis for: ANS:- A complete and accurate estimate of
project costs and lists all major items of work in the order they are to be performed.

,A major difference between the EIN and the BIN is: ANS:- One is federal and one is
state


Poor construction and storage practices can result in _________________ inside the
structure walls. ANS:- Molds and fungus


Builders now must use corrosion-resistance flashing in these specified locations,
except: ANS:- Surrounding all interior bedroom doors.


Compliance with environmental regulations can protect a contractor from:


- All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims ANS:- - All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims


Using the Quantity Take-Off method for estimating, you begin by estimating the cost
of _________________ for each individual task. ANS:- Labor and materials


Contractors must apply for permits through: ANS:- Their local building department


A cost effective method for managing material costs and keeping inventory costs
down is the: ANS:- JIT - Just In Time


These are materials prohibited form open burning in Oregon except for: ANS:-
Unpainted and untreated scrap wood


An owner-seller may comply with the Homebuyers Protection Act (HPA) by:


- Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled claims of lien,

, - Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow
ANS:- - Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow


What are the possible consequences that a contractor may face if he or she fails to
provide the information to the Owner About Construction Liens when required?


- All of these are correct
- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended
ANS:- - All of these are correct
- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended


Withheld taxes are considered to be "_____________" funds that do not belong to
the business and cannot be used for any other purpose. ANS:- Trust


The major purpose of the building exterior shell is to: ANS:- Provide protection for
the building at its exterior boundaries and to enclose a suitable interior environment


A project manager can be involved in more than one construction project at the
same time. ANS:- True


The building exterior shell may consist of:


- All of these are part of the building exterior shell
- Only windows and doors
- Only exterior wall assemblies
- Only roof assemblies ANS:- - All of these are part of the building exterior shell

Reviews from verified buyers

Showing all 3 reviews
2 year ago

2 year ago

2 year ago

5.0

3 reviews

5
3
4
0
3
0
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Welch1 Walden University
View profile
Follow You need to be logged in order to follow users or courses
Sold
64
Member since
7 year
Number of followers
56
Documents
459
Last sold
3 months ago

4.3

9 reviews

5
5
4
2
3
2
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions