….,,,./.,./.,./../../../…./././././.,.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,.,.,.
LADWP Electric Station Operator Exam
V2 2026/2027 | Complete Practice
Questions & Answer Explanations |
Electrical Substation Operations Study
Guide
Valley Service Planning Office Location
7501 Tyrone Avenue
Van Nuys, CA 91405
Metropolitan Service Planning Office Location
Lincoln Heights
2633 Artesian Street
Los Angeles, CA 90031
Customer Station Design Group Location
Lincoln Heights
2633 Artesian Street
Los Angeles, CA 90031
Tract Design Group Location
,….,,,./.,./.,./../../../…./././././.,.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,.,.,.
Lincoln Heights
2633 Artesian Street
Los Angeles, CA 90031
Telecommunications Group Location
JFB
111 N. Hope Street
Los Angeles, CA 90031
Areas served by SCE
1. San Fernando
2. Beverly Hills and West Hollywood
3. Veterans Administration
4. Marina Del Ray
5.Universal Studios
Valley Service Planning Office Boundary
Addresses on Mulholland Drive & west of Hollywood freeway between Mulholland Drive and
Barham Blvd.
Metropolitan Service Planning Office Boundary
Addresses on Barham Blvd. & East of Hollywood Freeway between Mulholland Drive and
Barham Blvd.
, ….,,,./.,./.,./../../../…./././././.,.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,.,.,.
What must be provided by the customer when submitting plans?
1. A complete Service Planning Information sheet (Pg. 1-19) for master copy.
2. Electrical Plans including load schedules, single-line diagrams, and equipment elevation
drawings.
3. Plot grading, elevation, and site improvement plans.
4. Any addition information requested by the service planner needed to assist department in
finalizing the customer's plans.
What documents will the dept provide after submitting plans?
Underground Projects: Construction drawing or other documentation specifying the facilities that
the customer must install on the customer's premises to accommodate the dept.'s transformers,
cables, and any other equipment needed to supply customer load
Overhead Projects: Written confirmation of the serving pole and its location.
Who must the customer contact to make an application for electric service?
Customer Service Branch Office (pg. 1-8)
When will construction be started or service established?
After customer pays in full for all fees and charges assessed by the dept. (pg. 1-8)
Fees Include: application fee, charges for temporary services, charges for construction or
relocation of Dept Facilities, charges for line extensions or excess conductor allowances, charges
for interconnection or customer-owned generation facilities and charges for nonstandard
installations.
LADWP Electric Station Operator Exam
V2 2026/2027 | Complete Practice
Questions & Answer Explanations |
Electrical Substation Operations Study
Guide
Valley Service Planning Office Location
7501 Tyrone Avenue
Van Nuys, CA 91405
Metropolitan Service Planning Office Location
Lincoln Heights
2633 Artesian Street
Los Angeles, CA 90031
Customer Station Design Group Location
Lincoln Heights
2633 Artesian Street
Los Angeles, CA 90031
Tract Design Group Location
,….,,,./.,./.,./../../../…./././././.,.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,.,.,.
Lincoln Heights
2633 Artesian Street
Los Angeles, CA 90031
Telecommunications Group Location
JFB
111 N. Hope Street
Los Angeles, CA 90031
Areas served by SCE
1. San Fernando
2. Beverly Hills and West Hollywood
3. Veterans Administration
4. Marina Del Ray
5.Universal Studios
Valley Service Planning Office Boundary
Addresses on Mulholland Drive & west of Hollywood freeway between Mulholland Drive and
Barham Blvd.
Metropolitan Service Planning Office Boundary
Addresses on Barham Blvd. & East of Hollywood Freeway between Mulholland Drive and
Barham Blvd.
, ….,,,./.,./.,./../../../…./././././.,.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,./.,.,.,.
What must be provided by the customer when submitting plans?
1. A complete Service Planning Information sheet (Pg. 1-19) for master copy.
2. Electrical Plans including load schedules, single-line diagrams, and equipment elevation
drawings.
3. Plot grading, elevation, and site improvement plans.
4. Any addition information requested by the service planner needed to assist department in
finalizing the customer's plans.
What documents will the dept provide after submitting plans?
Underground Projects: Construction drawing or other documentation specifying the facilities that
the customer must install on the customer's premises to accommodate the dept.'s transformers,
cables, and any other equipment needed to supply customer load
Overhead Projects: Written confirmation of the serving pole and its location.
Who must the customer contact to make an application for electric service?
Customer Service Branch Office (pg. 1-8)
When will construction be started or service established?
After customer pays in full for all fees and charges assessed by the dept. (pg. 1-8)
Fees Include: application fee, charges for temporary services, charges for construction or
relocation of Dept Facilities, charges for line extensions or excess conductor allowances, charges
for interconnection or customer-owned generation facilities and charges for nonstandard
installations.