Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

EROSION AND SEDIMENT CONTROL TEST 1 QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
01-05-2026
Written in
2025/2026

EROSION AND SEDIMENT CONTROL TEST 1 QUESTIONS AND ANSWERS

Institution
NPDES
Course
NPDES

Content preview

EROSION AND SEDIMENT CONTROL
TEST 1 QUESTIONS AND ANSWERS


2-year, 24-hour storm even - ans-maximum 24- sq sq sq sq sq sq




hour precipitation event with a probable recurrence interval of once in two years as defined
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




by the National Weather Service and Technical Paper No. 40, "Rainfall Frequency Atlas of
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




the US" May 1961 or equivalent regional rainfall probability information developed there fro
sq sq sq sq sq sq sq sq sq sq sq sq




m

24-hour Precipitation Event - ans- sq sq sq sq




amount of precipitation which occurs within any 24 hour period
sq sq sq sq sq sq sq sq sq




AEMA - ans-Alabama Environmental Management Act, Code of Alabama 1975
sq sq sq sq sq sq sq sq sq




Alabama Handbook - ans- sq sq sq




current edition of the Alabama Handbook for Erosion Control, Sediment Control, and Stor
sq sq sq sq sq sq sq sq sq sq sq sq




mwater Management on Construction Sites and Urban Areas published by the Alabama S
sq sq sq sq sq sq sq sq sq sq sq sq




oil and Water Conservation Committee (ASWCC) at the time permit coverage is obtained
sq sq sq sq sq sq sq sq sq sq sq sq




ADEM - ans-Alabama Department of Environmental Management
sq sq sq sq sq sq




Agricultural Practices - ans- sq sq sq




practices commensurate with the size of the farming operation that are implemented in a m
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




anner that meet or exceed the Natural Resources Conservation Service technical standard
sq sq sq sq sq sq sq sq sq sq sq




s and guidelines, including but not limited to farm ponds that are constructed for the primary
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




purpose of irrigation and/
sq sq sq sq




or watering livestock, terraces, grassed waterways, vegetative filter strips, cropland grade
sq sq sq sq sq sq sq sq sq sq sq




stabilized measures drainage tiles, underground outlets, land leveling, dike/
sq sq sq sq sq sq sq sq




diversion structures and other grade stabilized structures sq sq sq sq sq sq




AWPCA - ans-Alabama Water Pollution Control Act sq sq sq sq sq sq




Best Management Practices (BMPs) - ans-
sq sq sq sq sq




implementation and continued maintenance of appropriate structural and non- sq sq sq sq sq sq sq sq




structural practices and management strategies to prevent and minimize the introduction o
sq sq sq sq sq sq sq sq sq sq sq




f pollutants to stormwater and to treat stormwater to remove pollutants prior to discharge
sq sq sq sq sq sq sq sq sq sq sq sq sq

, Borrow Area "Pit" - ans- sq sq sq sq




the activity of removing material (soil, gravel, sand) from one area to use in another area. F
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




or the purposes of this
sq sq sq sq




permit, this activity is solely in conjunction with the project requesting permit coverage and t
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




he material is not to be sold for profit. The borrow
sq sq sq sq sq sq sq sq sq sq




area and associated activity shall be located within a two-
sq sq sq sq sq sq sq sq sq




mile radius of the project requesting permit coverage to be considered as part of the
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




project and will open and close with the project requesting permit coverage
sq sq sq sq sq sq sq sq sq sq sq




Chronic and Catastrophic Precipitation - ans- sq sq sq sq sq




precipitation events which may result in failure of the properly designed, located, implemen
sq sq sq sq sq sq sq sq sq sq sq sq




ted,
and maintained BMPs or other structure/
sq sq sq sq sq




practices required by this permit. Catastrophic precipitation conditions means any single e
sq sq sq sq sq sq sq sq sq sq sq




vent of sq




significant total volume, or of increased intensity and shortened duration, that exceeds nor
sq sq sq sq sq sq sq sq sq sq sq sq




mally expected or predicted precipitation over the time
sq sq sq sq sq sq sq




period that the disturbance is planned or is ongoing, as determined by the Department. Cat
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




astrophic conditions could also include tornadoes, sq sq sq sq sq




hurricanes, or other climatic conditions which could cause failure due to winds or mechanic
sq sq sq sq sq sq sq sq sq sq sq sq sq




al damage. Chronic precipitation is also that series of
sq sq sq sq sq sq sq sq




wet-weather conditions over a limited time- sq sq sq sq sq




period which does not provide any opportunity for emergency maintenance, reinstallation,
sq sq sq sq sq sq sq sq sq sq sq




and
corrective actions and which equals or exceeds the volume of normally expected or predict
sq sq sq sq sq sq sq sq sq sq sq sq sq




ed precipitation for the time period that the disturbance
sq sq sq sq sq sq sq sq




is planned or is ongoing
sq sq sq sq




Common Plan of Development or Sale - ans- sq sq sq sq sq sq sq




any announcement or piece of documentation (e.g., sign, public notice, or hearing, sales pi
sq sq sq sq sq sq sq sq sq sq sq sq sq




tch,
advertisement, drawing, permit application, zoning request, computer design, etc.) or phys sq sq sq sq sq sq sq sq sq sq




ical demarcation (e.g., boundary signs, lot stakes,
sq sq sq sq sq sq




surveyor markings, etc.) indicating construction activities may occur on a specific plot
sq sq sq sq sq sq sq sq sq sq sq




Construction - ans- sq sq




any land disturbance or discharges of pollutants associated with, or the result of building, e
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




xcavation, land clearing, grubbing, sq sq sq




placement of fill, grading, blasting, reclamation, areas in which construction materials are s
sq sq sq sq sq sq sq sq sq sq sq sq




tored in association with a land disturbance or handled
sq sq sq sq sq sq sq sq




above ground and other associated areas including, but not limited to, construction site veh
sq sq sq sq sq sq sq sq sq sq sq sq sq




icle parking, equipment or supply storage areas, material
sq sq sq sq sq sq sq




stockpiles, temporary office areas, and access roads. Construction also means significant
sq sq sq sq sq sq sq sq sq sq sq




pre-construction land disturbance activities performed sq sq sq sq




in support or in advance of construction activity including, but not limited to, land clearing, e
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




xcavation, removal of existing buildings, dewatering, sq sq sq sq sq

Written for

Institution
NPDES
Course
NPDES

Document information

Uploaded on
May 1, 2026
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

CA$21.90
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DeligentSuccess Chamberlain College Nursing
Follow You need to be logged in order to follow users or courses
Sold
18
Member since
10 months
Number of followers
1
Documents
1004
Last sold
1 week ago
Deligent testbanks store:

Welcome to deligent success:where we offer high-quality test banks and study materials designed to help you excel academically. Deligent, hard work, perseverance, excellence are the values that cause things to happen.”

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions