100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

VA DEQ ECS/ SWM Inspector Exam (Latest 2026/ 2027 Update) 100% Verified Questions & Answers

Puntuación
-
Vendido
-
Páginas
43
Grado
A+
Subido en
20-12-2025
Escrito en
2025/2026

VA DEQ ECS/ SWM Inspector Exam (Latest 2026/ 2027 Update) 100% Verified Questions & Answers

Institución
VA DEQ ECS/ SWM Inspector
Grado
VA DEQ ECS/ SWM Inspector











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
VA DEQ ECS/ SWM Inspector
Grado
VA DEQ ECS/ SWM Inspector

Información del documento

Subido en
20 de diciembre de 2025
Número de páginas
43
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

VA DEQ ECS/ SWM Inspector Exam
(Latest 2026/ 2027 Update) 100%
Verified Questions & Answers
VESCP -CORRECTANSWER Virginia Erosion and Sediment Control Program



- Administered by counties/cities (must), towns (may)

- MUST BE APPROVED



Minimum Standard 1 -CORRECTANSWER Stabilization



permanent or temporary soil stabilization shall be applied to denuded areas within

seven days after final grade is reached on any portion of the site; temporary soil

stabilization shall be applied within seven days to denuded areas that may not be at

final grade but will remain dormant for longer than 14 days; permanent stabilization shall

be applied to areas that are to be left dormant for more than one year



Site NOT at Final Grade -CORRECTANSWER - stabilize in 14 days

- temporarily seed

- mulch

- permanently stabilize if dormant > 1 year

,Site at Final Grade -CORRECTANSWER - stabilize in 7 days (recommended

immediately)

- permanently or temporarily seed and mulch

- mulch/matting/straw



Minimum Standard 2 -CORRECTANSWER Stock Piles, Waste and Borrow Areas



during construction, soil stock piles and borrow areas shall be stabilized or protected

with sediment trapping measures



mulch prevents erosion by protecting the surface from raindrop impact and silt fence

intercepts and detains from disturbed areas



Minimum Standard 3 -CORRECTANSWER Permanent Vegetation



permanent vegetation cover shall be established on denuded areas not otherwise

permanently stabilized (permanent vegetation shall not be considered established until

a ground cover is achieved that is uniform, mature enough to survive, and will inhibit

erosion *there is no % associated with this*)



reduce erosion and decrease sediment yield from disturbed area



this is the standard used to verify that a site is ready for release of bonds or surety

,Minimum Standard 4 -CORRECTANSWER First-Step Measures



Sediment basins and traps, perimeter dikes, sediment barriers and other measures

intended to trap sediment shall be constructed as a first step in any land-disturbing

activity and shall be made functional before upslope land disturbance takes place



a certain amount of initial land disturbance may be required to provide access for

equipment to install the perimeter controls, but site clearing and grading should be kept

to a minimum until the perimeter controls are in place



intercepts and detains small amounts of sediment from disturbed areas during

construction operation to prevent sediment from leaving the site and decrease velocity

of sheet flows and low-to-moderate level channel flow



Perimeter Controls -CORRECTANSWER assures that sediment does not leave the

perimeter of the land-disturbing area once site clearing, grading, and construction

commences



Examples: silt fences, sediment traps, sediment basins, construction entrance,

temporary diversions, diversions



Minimum Standard 5 -CORRECTANSWER Earthen Structure Stabilization

, stabilization measures shall be applied to earthen structures such as dams, dikes, and

diversions immediately after installation



reduce erosion and sedimentation and reduce damage from sediment and runoff to

downstream or off-site areas



Minimum Standard 6 -CORRECTANSWER Traps and Basins



sediment traps and basins shall be designed and constructed based upon the total

drainage area (not just disturbed area) to be served by the trap or basin



Sediment Traps -CORRECTANSWER minimum storage capacity shall be 134 cubic

yards per acre of drainage area and shall only control drainage areas less than 3 acres



*stone outlet = trap*



Sediment Basins -CORRECTANSWER surface runoff from disturbed areas that is

comprised of flow from drainage areas greater than or equal to 3 acres shall be

controlled by a basin; minimum storage capacity of a sediment basin shall be 134 cubic

yards per acre of drainage area; the outfall system shall, at a minimum, maintain the

structural integrity of the basin during a 25-year storm of 24-hour duration; runoff
$22.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EduDocsMarket Chamberlain College Nursing
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
146
Miembro desde
1 año
Número de seguidores
5
Documentos
2013
Última venta
5 horas hace

4.1

9 reseñas

5
5
4
2
3
1
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes