Asbestos Project Designer Exam
Actual Questions and Answers 2026
What does a Project Designer Do? -
correct answer ✅Create specifications for Response Actions
What are the three situations that require a licensed project
designer in a school, public and commercial building? -
correct answer ✅1. Response action other than SSSD
2. Maintenance activity that disturbs ACBM other than SSSD
3. Response action for a major fiber release episode
Class I work definition -
correct answer ✅Work that involves the removal of TSI or
Surfacing Material (SM)
Class II work definition -
correct answer ✅Work that involves the removal of other "low-
risk" materials such as roofing, flooring an siding products
Asbestos abatement projects performed in conjunction with
renovation or demolition of a building require the project designer
to understand what three basic issues? -
correct answer ✅1. Scope of the Asbestos problem
2. Needs of the Building Owner
, Asbestos Project Designer Exam
Actual Questions and Answers 2026
3. Other Trades
What is the Aim of Project Designers? -
correct answer ✅The safe execution of high-quality abatement
work on schedule and within budget.
ACBM -
correct answer ✅Surfacing ACM, thermal system insulation ACM,
or miscellaneous ACM that is found in or on interior structural
members or other parts of a school building.
Friable -
correct answer ✅ACBM that can crushed or turned into a powder
with hand pressure alone
Functional Space -
correct answer ✅A room, group of rooms, or homogeneous area
designated by a person accredited to prepare management plans,
design abatement projects, or conduct response actions.
As a Project Designer, can you determine a designated area in a
school?
Actual Questions and Answers 2026
What does a Project Designer Do? -
correct answer ✅Create specifications for Response Actions
What are the three situations that require a licensed project
designer in a school, public and commercial building? -
correct answer ✅1. Response action other than SSSD
2. Maintenance activity that disturbs ACBM other than SSSD
3. Response action for a major fiber release episode
Class I work definition -
correct answer ✅Work that involves the removal of TSI or
Surfacing Material (SM)
Class II work definition -
correct answer ✅Work that involves the removal of other "low-
risk" materials such as roofing, flooring an siding products
Asbestos abatement projects performed in conjunction with
renovation or demolition of a building require the project designer
to understand what three basic issues? -
correct answer ✅1. Scope of the Asbestos problem
2. Needs of the Building Owner
, Asbestos Project Designer Exam
Actual Questions and Answers 2026
3. Other Trades
What is the Aim of Project Designers? -
correct answer ✅The safe execution of high-quality abatement
work on schedule and within budget.
ACBM -
correct answer ✅Surfacing ACM, thermal system insulation ACM,
or miscellaneous ACM that is found in or on interior structural
members or other parts of a school building.
Friable -
correct answer ✅ACBM that can crushed or turned into a powder
with hand pressure alone
Functional Space -
correct answer ✅A room, group of rooms, or homogeneous area
designated by a person accredited to prepare management plans,
design abatement projects, or conduct response actions.
As a Project Designer, can you determine a designated area in a
school?