Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 24 páginas
Examen

Florida Certified General Contractor Exam Questions And Correct Answers (Verified Answers) Plus Rationale2026 Q&A| Instant Download Pdf

Document preview thumbnail
Vista previa 3 fuera de 24 páginas

Florida Certified General Contractor Exam Questions And Correct Answers (Verified Answers) Plus Rationale2026 Q&A| Instant Download Pdf

Vista previa del contenido

Florida Certified General Contractor
Exam Questions And Correct Answers
(Verified Answers) Plus Rationale2026
Q&A| Instant Download Pdf


1. What is the primary purpose of Florida’s Building Code?

A. To establish construction schedules
B. To control contractor licensing
C. To protect the public’s health, safety, and welfare
D. To standardize architectural designs
Rationale: Building codes exist to ensure health, safety, and general
welfare in the built environment.

2. A Notice of Commencement in Florida is valid for how long?

A. 30 days
B. 60 days
C. 1 year
D. 2 years
Rationale: Florida law sets NOC validity to 1 year unless an earlier
termination is recorded.

3. Who is responsible for verifying soil-bearing capacity before
foundation work?

A. City inspector
B. General contractor
C. Owner
D. Architect

,Rationale: The contractor must ensure conditions match the construction
documents and code requirements.

4. What is the minimum compressive strength for standard concrete
footings used in residential construction (typical)?

A. 1,500 psi
B. 2,500 psi
C. 3,000 psi
D. 4,500 psi
Rationale: Most Florida residential footings require 2,500 psi minimum per
code and conventional practice.

5. Which document is required before final payment can be released to
the contractor?

A. Material order sheet
B. Daily log
C. Punch list
D. Final contractor’s affidavit
Rationale: Florida statute requires a contractor’s affidavit confirming all
subs/suppliers are paid.

6. When must a Notice to Owner be served to protect lien rights?

A. After project completion
B. Within 45 days of first furnishing labor/materials
C. Before the permit is issued
D. Within 10 days of the NOC
Rationale: A NTO must be served within 45 days of first work to preserve
lien rights.

7. A contractor encounters differing site conditions. What should they do
first?

A. Continue working
B. Notify the owner/architect immediately
C. Stop the contract
D. Increase the project cost

, Rationale: Prompt notice is required so the owner can verify and authorize
adjustments.

8. What is the maximum allowed slope for a handicapped ramp?

A. 1:8
B. 1:10
C. 1:12
D. 1:20
Rationale: ADA and Florida accessibility require a maximum slope of 1:12.

9. Which project delivery method gives the contractor the most cost
risk?

A. Cost-plus
B. Design-build
C. Lump-sum (fixed price)
D. CM-at-risk
Rationale: Lump-sum contracts place cost overruns entirely on the
contractor.

10. OSHA requires fall protection at what height in construction?

A. 3 ft
B. 4 ft
C. 6 ft
D. 10 ft
Rationale: OSHA construction fall protection trigger height is 6 ft.



11. Which insurance covers employee injuries?

A. General liability
B. Workers’ compensation
C. Property insurance
D. Builder’s risk
Rationale: Workers’ compensation covers on-the-job employee injuries.

Información del documento

Subido en
15 de diciembre de 2025
Número de páginas
24
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$22.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CertCrush
3.5
(24)
Vendido
133
Seguidores
1
Artículos
6078
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes