BAILEY BRIDGE EXAM LATEST QUESTIONS AND VERIFIED ANSWERS Given a 210-foot TT bridge. What is the position of launching-nose links? - Correct Answer 30x40ft How many personnel does the routine repair detail consists of? - Correct Answer 6 How many personnel does the maintenance party usually consist of for important bridges subject to enemy action? - Correct Answer entire assembly crew What is the required safety setback on an unprepared abutment if the bank height is 6 feet? - Correct Answer (1.5) 6ft = 9ft Given a 140-foot TS bridge with grillage type 1 on both the near shore (NS) and far shore (FS). The far-bank seat is level with the near-bank seat. What is the position of the launching-nose links? - Correct Answer 20x40ft How is the initial bridge length determined? - Correct Answer adding the width of the gap, the safety setbacks, and the roller cl
Escuela, estudio y materia
- Institución
- BAILEY BRIDGE
- Grado
- BAILEY BRIDGE
Información del documento
- Subido en
- 12 de diciembre de 2025
- Número de páginas
- 5
- Escrito en
- 2025/2026
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
- bailey bridge
-
bailey bridge exam latest questions and verified a
-
given a 210 foot tt bridge what is the position o
-
how many personnel does the routine repair detail
Documento también disponible en un lote