LEED GREEN ASSOCIATE EXAM
The integrative process should be started:
a) b/w the design + construction phase
b) after the design process begins
c)before the design process begins
d) as soon as the project team is assembled regardless of what stage design is in
e) after the bidding process is complete - Answers-c) before the design process begins
The three phases of integrative process include: (select three)
a) recovery
b) discovery
c) development
d) implementation
e) occupancy - Answers-b, d, e discover, implementation, occupancy
The number of points assigned to each credit in the LEED rating systems is determined by the:
a) Credit's ranking on USBGC's list of seven impact categories
b) Popularity of the credit with project teams
c) Category it is in
d) Number of times that type of credit appears in the rating system
e) Impact on the usage of water - Answers-a) Credit's ranking on USBGC's list of seven impact categories
,There are _ different rating system adaptations within five categories:
15
21
27
33 - Answers-21
LEED: BD + C ___ applies to buildings equipped to contain high-density computing equipment such as
server racks.
New Construction
Warehouses and Distribution Center
Data Centers
Core and Shell Development - Answers-Data Centers
___ points are available in the Materials and Resources Category for LEED BD + C New Construction
Five
Eight
Thirteen
Nineteen - Answers-Thirteen
Induction cooktops can be used in kitchens as a sustainable practice because they transfer___% of their
heat to pots
30
40
70
90 - Answers-90
, gardens without a soil system
horizontal
vertical
aeroponic
anaerobic - Answers-aeroponic
_____ analyze energy-usage data to create actionable solutions for energy efficiency
energy consultants
landscape architects
construction managers
engineers - Answers-energy consultants
each rating system includes adaptations with unique checklists that address specific
contracting methods
project locations
building methods
project types - Answers-project types
According to the UNEP Buildings and Climate Change Report, buildings account for approximately ___%
of total energy used today.
20
40
60
The integrative process should be started:
a) b/w the design + construction phase
b) after the design process begins
c)before the design process begins
d) as soon as the project team is assembled regardless of what stage design is in
e) after the bidding process is complete - Answers-c) before the design process begins
The three phases of integrative process include: (select three)
a) recovery
b) discovery
c) development
d) implementation
e) occupancy - Answers-b, d, e discover, implementation, occupancy
The number of points assigned to each credit in the LEED rating systems is determined by the:
a) Credit's ranking on USBGC's list of seven impact categories
b) Popularity of the credit with project teams
c) Category it is in
d) Number of times that type of credit appears in the rating system
e) Impact on the usage of water - Answers-a) Credit's ranking on USBGC's list of seven impact categories
,There are _ different rating system adaptations within five categories:
15
21
27
33 - Answers-21
LEED: BD + C ___ applies to buildings equipped to contain high-density computing equipment such as
server racks.
New Construction
Warehouses and Distribution Center
Data Centers
Core and Shell Development - Answers-Data Centers
___ points are available in the Materials and Resources Category for LEED BD + C New Construction
Five
Eight
Thirteen
Nineteen - Answers-Thirteen
Induction cooktops can be used in kitchens as a sustainable practice because they transfer___% of their
heat to pots
30
40
70
90 - Answers-90
, gardens without a soil system
horizontal
vertical
aeroponic
anaerobic - Answers-aeroponic
_____ analyze energy-usage data to create actionable solutions for energy efficiency
energy consultants
landscape architects
construction managers
engineers - Answers-energy consultants
each rating system includes adaptations with unique checklists that address specific
contracting methods
project locations
building methods
project types - Answers-project types
According to the UNEP Buildings and Climate Change Report, buildings account for approximately ___%
of total energy used today.
20
40
60