SCRIPT 2026 COMPLETE QUESTIONS AND
SOLUTIONS
◉4.What screen title displays in the initial screen of the migo
transaction . Answer: A. The screen title depends on the last movement
type that was posted.
◉5.what is the menu path used to enter time confirmation and complete
a work order. Answer: A. Order>confirmation >overall completion
confirmation
◉6.what number is associated with the status that is used to deadline the
equipment. Answer: A. 30
◉7. When creating a dispatch (d1) notification , what cannot be done
before the notification is saved and the notification number is generated
Answer: C .the equipment dispatch 5987 form cannot be printed
◉What is the number of the inbound delivery that is associated with a
dedicated order from national Answer: 180008205
, ◉What link should be clicked in the AIT application to perform a
customer pick up at the Ssa and to bring materials into the units
inventory Answer: Pgr
◉What materials is available for this issue to work order Answer:
015954742
◉From an existing p.m. notification which button is selected to create
the preventative maintenance pmo2 to work order Answer: Button #2
◉In a maintenance notification where is the how recognize code
selected Answer: In the coding field
◉Which button do you click to display the listing of the classes of
supply they can be requisition by the MRP area Answer: Ext. Matl
group
◉What button is used to trigger the install/Dismantle process for the
selected engine Answer: Goods movement icon
◉What is the number of the return Zxs - pr that was created Answer:
1000040425
◉What's up systems are currently install in the functional location
structure Answer: A 50 caliber machine gun radio set