100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

FOREMAN TEST 1 & 2 QUESTIONS WITH CORRECT ANSWERS

Puntuación
-
Vendido
-
Páginas
20
Grado
A+
Subido en
26-11-2025
Escrito en
2025/2026

FOREMAN TEST 1 & 2 QUESTIONS WITH CORRECT ANSWERS

Institución
UA FOREMAN
Grado
UA FOREMAN










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
UA FOREMAN
Grado
UA FOREMAN

Información del documento

Subido en
26 de noviembre de 2025
Número de páginas
20
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

FOREMAN TEST 1 & 2 QUESTIONS
WITH CORRECT ANSWERS


Which of the following would be considered a primecontractor? - correct answer✔✔D. A
contractor with whom the project owner has established a contract.

Which of the following correctly identifies what is included in legitimate labor costs? -
correct answer✔✔D. Hourly wages, fridge benefit packages, payroll taxes insurance
and safety costs, and small tools and consumables

Which in the following best illustrates the PRIMARY role of a foreman? - correct
answer✔✔B. To Effectively manage and lead the crew

As a foreman what should ALWAYS be your FIRST priority when planning a job? -
correct answer✔✔D. Keeping the crew actively engaged in completing their work

As a foreman what should ALWAYS be your FIRST priority when planning of a project?
- correct answer✔✔B. Developing a job strategy before the job begins

Which of the following describe the purpose of Short Interval Planning or Look ahead
planning? - correct answer✔✔A. Breaking the job into small manageable pieces

Which of the following is the FIRST thing a foreman must do before beginning to plan a
job? - correct answer✔✔A. Read all the project-related documents

Which of the following provides the BEST example of prefabrication? - correct
answer✔✔A. To Create a product in the shop and install it in the field

Which of the following is NOT required on a daily log? - correct answer✔✔C. The work
completed by the individual crew members

Which of the following is NOT likely to lead to improved material handling? - correct
answer✔✔D. Have all the materials and equipment delivered at the beginning of the job

,Which of the following purchasing procedures is MOST likely to reduce material
handling time? - correct answer✔✔A. Bag and Tag all materials as appropriate

What should a foreman do if damage to he/she is discovered AFTER the delivery driver
has left the job site? - correct answer✔✔C. Notify the Project manager and note the
damage on the daily log.

Which of the following location represents the BEST place to store job site materials in a
manner that enhance says productivity? - correct answer✔✔D. As close to the point of
installation as possible

With which of the following costs should a foreman be MOST concerned? - correct
answer✔✔A. Labor

Which of the following is NOT considered a DIRECT job cost? - correct answer✔✔D.
Home office overhead

An ______ occurs when any condition or document modifies the work as defined in the
contract during the BIDDING process - correct answer✔✔B. Addendum

Where can the requirements for "Job Close Out" be found? - correct answer✔✔B.
Within the contract documents.

During the course of a project you have noticed that there is a greater than normal
number of Change orders being submitted. Which of the following is the MOST
important step that you need to take? - correct answer✔✔C. Maintain an accurate job
log in case specific questions are asked about why the project was completed in ways it
was.

A "Log Book" is the most appropriate place to document which of the following? -
correct answer✔✔A. The events that occurred on the job site each day.

Certain steps are typically followed when starting a job. Among those listed below which
of the following options correctly identifies the order these steps should be completed? -
correct answer✔✔C. Sketch, Layout, Order Material, Install.

When is the BEST time for a foreman to hold information sharing "Toolbox Safety Talks"
- correct answer✔✔D. Regularly on a weekly basis to address safety issues and learn
about new tools or materials

The bid documents associated with your project state, "Do not remove or disturb and
asbestos containing material. You have 3 days before a planned outage to remove a
12" insulated gate valve that you suspect has asbestos covering. What should you do? -
correct answer✔✔C. Contact your supervisor for proper procedures and instructions on
how you should proceed.

, While creating the rough layout for a piping project, you discover a problem with the 2"
Hot Water Supply and Hot Water return piping. By following the design specifications
you determine that these pipes will be interfering with the sheet metal subcontractors
ductwork. Which of the following actions should the piping foreman take? - correct
answer✔✔B. Report the interference to your project manager

As general rule, when is the BEST time for a foreman to schedule effecting meetings
with their work crew? - correct answer✔✔C. At the beginning of the shift.

Which of the following represents an effective way to ensure that the job is progressing
within the allowed budget? - correct answer✔✔D. Keep a log of man used hours and
compare it to the percentage of the job completed.

Assumes that each of those steps below must be taken at some point when ordering
materials.
A. Call Supply House with Lists.
B. Make a drawing.
C. List Materials'
D. Call for availability and prices - correct answer✔✔A. B,C,D,A

Which of the following is a true statement with respect to a foremans responsibility
related to his or she crew? - correct answer✔✔D. The foreman is responsible for
anything that occurs at the job site from the beginning of the workday/shift to the end of
the workday/shift

After piping a water system, what is the FIRST step that should be taken? - correct
answer✔✔A. Test

Refer to the figure below when answering this question. A pipe needs to come up in the
wall marked howfar is the center from the wall from column line C? - correct
answer✔✔B. 5 feet 9 inches

How far is it from the center of the pipe located in the wall marked to line D? - correct
answer✔✔C. 35 feet 9 inches

Using the formula below what is the correct 45-degree offset when you have a rolling
offset where the roll is 8 inches and the rise is 6 inches? - correct answer✔✔C. 10
inches

On the project there is a bank of four pipe runs with each pipe measuring three inches
in diameter which measure 12 inches in length on the blueprint. The scale used on the
blueprint is 1/4" equals 1 foot How manyfeet of 3-inch pipe should be ordered to
complete the runs? - correct answer✔✔D. 192 feet

Convert 170 inches to feet and inches - correct answer✔✔B. 14 feet 2 inches
$8.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
lectbetty Harvard University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
21
Miembro desde
1 año
Número de seguidores
0
Documentos
2472
Última venta
1 semana hace
Betty

Welcome to Bettys store, your reliable source for high-quality test banks and study materials drawn to help you stand out academically. We offer a broad range of resources including test banks, study guides, solution manuals, and other study materials, all dilligently curated to ensure accuracy and effectiveness. Our affordable, instantly accessible materials are complemented by excellent customer support, making your learning experience seamless and efficient. Trust Betty to be your friend in academic success.

Lee mas Leer menos
3.5

2 reseñas

5
0
4
1
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes