Terms in this set (83)
Submittals that require a responsive action by the
Designated Owner Representative (DOR).
Action Submittals
Considerations regarding the visual appeal of the
Aesthetic concerns building.
Pre-determined amounts set aside for specific
Allowances items in the contract.
Options that can be added or removed from the
Alternates contract.
, False.
Are bonds considered
insurance?
Coordination drawings are not always considered
Are coordination Contract Documents.
drawings considered
Contract Documents?
As builts The term 'as builts' is never used by CSI.
True.
Can contractors seek
additional contract time
for incomplete
submittals?
False.
Can submittals be used
by the contractor to
modify the contract?
, Documents that verify compliance with specific
Certifications standards or requirements.
Modifications to the contract that may affect the
Change Orders contract sum.
Includes maintenance agreements, O&M data,
bonds, special extended warranties, record
documents, spare parts & attic stock, sustainable
Closeout and closeout docs, software, and keying.
maintenance submittals
Developed and maintained by the contractor.
Construction progress
schedule
Define the proposed construction known as 'The
Contract Documents Work'.
Changes made to the original contract documents,
Contract Modifications often requiring formal approval.
Submittals that require a responsive action by the
Designated Owner Representative (DOR).
Action Submittals
Considerations regarding the visual appeal of the
Aesthetic concerns building.
Pre-determined amounts set aside for specific
Allowances items in the contract.
Options that can be added or removed from the
Alternates contract.
, False.
Are bonds considered
insurance?
Coordination drawings are not always considered
Are coordination Contract Documents.
drawings considered
Contract Documents?
As builts The term 'as builts' is never used by CSI.
True.
Can contractors seek
additional contract time
for incomplete
submittals?
False.
Can submittals be used
by the contractor to
modify the contract?
, Documents that verify compliance with specific
Certifications standards or requirements.
Modifications to the contract that may affect the
Change Orders contract sum.
Includes maintenance agreements, O&M data,
bonds, special extended warranties, record
documents, spare parts & attic stock, sustainable
Closeout and closeout docs, software, and keying.
maintenance submittals
Developed and maintained by the contractor.
Construction progress
schedule
Define the proposed construction known as 'The
Contract Documents Work'.
Changes made to the original contract documents,
Contract Modifications often requiring formal approval.