Who give job briefing? - correct answer ✔✔ The person in charge/ gang foreman
What job briefing form called? - correct answer ✔✔ NRPC 3044
How often is pole top rescue practiced? - correct answer ✔✔ Once a year/ annually
What will be repeated by the person receiving orders? - correct answer ✔✔ switching orders
Emergency radio transmissions will be proceeded by what? - correct answer ✔✔ The word
emergency 3 times
Is smoking allowed on Amtrak property? - correct answer ✔✔ No
Fall protection is required if you are at least ______ feet off the ground - correct answer ✔✔ 6
feet
What is the bight of the rope? - correct answer ✔✔ A loop formed so the two sides lay aside
each other
what are the three parts of a hand line? - correct answer ✔✔ a. Mailine b. Block c.sling
Steps to install single grounds: - correct answer ✔✔ A. call power director - request power
B. Make signal interruption
, C. Receive clearance from power director
D. climb the pole
e. Tic test the circuit
F. Apply proper grounds
Steps to install transmission grounds - correct answer ✔✔ A. call power director-- request
power
B. check air breaks are open and ground switch is closed
c. receive clearance from the power director
d. climb pole
e. Apply proper grounds
Steps to install rail grounds - correct answer ✔✔ A. call power director ---- receive power
b. receive clearance from power director
c. obtain foul on track
d. tick test the circuit
e. apply proper grounds
The power Directors phone number can be found where ? - correct answer ✔✔ AMT 2
What is an NEC 105? - correct answer ✔✔ Red Tag
What is the clearance sheet called? - correct answer ✔✔ NEC 260
What tool must have a handle? - correct answer ✔✔ file
questions with correct answers
Who give job briefing? - correct answer ✔✔ The person in charge/ gang foreman
What job briefing form called? - correct answer ✔✔ NRPC 3044
How often is pole top rescue practiced? - correct answer ✔✔ Once a year/ annually
What will be repeated by the person receiving orders? - correct answer ✔✔ switching orders
Emergency radio transmissions will be proceeded by what? - correct answer ✔✔ The word
emergency 3 times
Is smoking allowed on Amtrak property? - correct answer ✔✔ No
Fall protection is required if you are at least ______ feet off the ground - correct answer ✔✔ 6
feet
What is the bight of the rope? - correct answer ✔✔ A loop formed so the two sides lay aside
each other
what are the three parts of a hand line? - correct answer ✔✔ a. Mailine b. Block c.sling
Steps to install single grounds: - correct answer ✔✔ A. call power director - request power
B. Make signal interruption
, C. Receive clearance from power director
D. climb the pole
e. Tic test the circuit
F. Apply proper grounds
Steps to install transmission grounds - correct answer ✔✔ A. call power director-- request
power
B. check air breaks are open and ground switch is closed
c. receive clearance from the power director
d. climb pole
e. Apply proper grounds
Steps to install rail grounds - correct answer ✔✔ A. call power director ---- receive power
b. receive clearance from power director
c. obtain foul on track
d. tick test the circuit
e. apply proper grounds
The power Directors phone number can be found where ? - correct answer ✔✔ AMT 2
What is an NEC 105? - correct answer ✔✔ Red Tag
What is the clearance sheet called? - correct answer ✔✔ NEC 260
What tool must have a handle? - correct answer ✔✔ file