100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PE 4th Part A ABSA Test Bank UPDATED ACTUAL Questions and CORRECT Answers

Puntuación
-
Vendido
-
Páginas
21
Grado
A+
Subido en
02-11-2025
Escrito en
2025/2026

PE 4th Part A ABSA Test Bank UPDATED ACTUAL Questions and CORRECT Answers

Institución
ABSA
Grado
ABSA










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ABSA
Grado
ABSA

Información del documento

Subido en
2 de noviembre de 2025
Número de páginas
21
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PE 4th Part A ABSA Test Bank UPDATED ACTUAL Questions
and CORRECT Answers

Introduction to Power Introduction to Power Engineering
Engineering

Which of the following is not a d) Any one or more boilers in which steam or other vapour is
definition of a power plant? generated at less than 57 kPa (8 psi).


a) Any one or more boilers in
which steam or other vapour is
generated at more than 103 kPa
(15 psi).
b) Any one or more boilers
containing liquid and having a
working pressure exceeding
1100 kPa (160 psi).
c) Any one or more boilers
containing liquid and having a
working temperature exceeding
121 degrees Celsius (250
degrees Fahrenheit).
d) Any one or more boilers in
which steam or other vapour is
generated at less than 57 kPa (8
psi).
e) Any engine run from one or
more boilers containing liquid
and having a working pressure
exceeding 1100 kPa (160 psi).

,Early government involvement d) pollution
in certification of power
engineers became more
important for the following
reasons except:


a) efficiency
b) labour mobility
c) safety
d) pollution
e) technological advancements

Which of the following is not c) manual flame checking
characteristic of increased
automation in power plants?


a) computerized control stations
b) increased mechanization
c) manual flame checking
d) continuous monitoring of
processes
e) continuous monitoring of
costs

"Power plant" means a) any one or more boilers in which steam or other vapour is
generated at more than 103 kPa (15 psi).
a) any one or more boilers in
which steam or other vapour is
generated at more than 103 kPa
(15 psi).
b) any one or more boilers in
which steam or other liquid is
generated at more than 103 kPa
(15 psi).
c) any one or more boilers
containing liquid and having a
working pressure exceeding
1,200 kPa (160 psi), and a
temperature exceeding 121
degrees C (250 degrees F).
d) any one or more boilers
containing liquid and having a
working pressure exceeding
1,200 kPa (160 psi), and a
temperature not exceeding 121
degrees C (250 degrees F).
e) any one or more boilers
containing liquid and having a
working pressure not exceeding
1,100 kPa (160 psi), and a
temperature exceeding 121
degrees C (250 degrees F).

, Power engineers are c) skilled workers who operate and maintain the equipment in a
power plant.
a) safety code officers in a
power plant automatically.
b) qualified to perform any
welding jobs in a power plant.
c) skilled workers who operate
and maintain the equipment in a
power plant.
d) qualified to perform any
electrical jobs in a power plant.
e) qualified to make design
changes in a power plant.

In the early days, owners of d) unskilled
power plants hired __________
workers, who started out doing
manual labour and through
acquired experience they were
promoted to jobs with gradually
increasing levels of skill.


a) qualified
b) highly educated
c) trained
d) unskilled
e) college trained

In order to produce greater b) serious accidents
efficiency, higher boiler
pressures were used and this led
to ______ due to
employing of unqualified
operators in a power plant.


a) economic gains
b) serious accidents
c) higher efficiency
d) safer working conditions
e) less labour disputes

Which of the following is not a b) Seasonal lay-offs
common work schedule for
power engineers?


a) Year round employment
b) Seasonal lay-offs
c) Eight hour days
d) Twelve hour days
e) Rotating day and night shifts

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
MGRADES Stanford University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1070
Miembro desde
1 año
Número de seguidores
102
Documentos
68976
Última venta
1 día hace
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

169 reseñas

5
73
4
30
3
44
2
8
1
14

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes