Delta Ramp Test Questions and Correct
Answers
ALA Ans: Aircraft Load Agent
AIC Ans: Agent In Charge
Delta Expectations Ans: practace safe operating procedure
Safely operate Ground Support Equipment (GSE)
Properly followcargo loading, unloading and handling procedure.
© 2025 All rights reserved
, 2 | Page
Report to work on time with proper Personal Protective Equipment
(PPE)
Follow arrival and departure policies and procedure.
Display a professional attitude and appearance.
GSE Ans: Ground Support Equipment
GOM Ans: Ground Operation Manual
The manual that governs ramp policies and procedures.
SPPM Ans: Safety Policy and Procedure Manual
Flight Classifications Ans: Originator
© 2025 All rights reserved
, 3 | Page
Terminator
Thru Flight
Originator Ans: Bigins at your station
Terminator Ans: Ends at your station
Thru Flight Ans: Arrive at your station and continues to another
station with the same flight number.
Professional Image Ans: working on the ramp is like being in a
(FISH BOWL)
Customers Expectation (3) Ans: Provide safe airport and flight
experience
Protect and transport bags to correct location
© 2025 All rights reserved