Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

MQM 227 Ch.7 Questions and Answers 100% Correct

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

MQM 227 Ch.7 Questions and Answers 100% Correct

Vista previa del contenido

MQM 227 Ch.7 Questions and Answers 100% Correct
The time needed to respond to a customer order is called the —Answer: lead time

Place the following production methods in order starting with the one having inventory closest
to the customer and then moving back to the one with inventory closest to the source.

Assemble-to-order

Make-to-stock

Engineer-to-order

Make-to-order —Answer: Make-to-stock

Assemble-to-order

Make-to-order

Engineer-to-order

____ time is the time needed to respond to a customer order. —Answer: Lead

Make-to-stock —Answer: A production environment where the customer is served "on-
demand" from finished goods inventory.

Assemble-to-order —Answer: A production environment where pre-assembled components,
subassemblies, and modules are put together in response to a specific customer order.

Make-to-order —Answer: A production environment where the product is built directly from
raw materials and components in response to a specific customer order.

Engineer-to-order —Answer: Here the firm works with the customer to design the product,
which is then made from purchased materials, parts, and components.

Firms that combine a number of preassembled modules to meet customer's specification are
called —Answer: assemble-to-order

True or false: The customer order decoupling point is where inventory is positioned in the
supply chain —Answer: True

If a car has four engine choices, three transmission choices, and five entertainment choices,
there are ____ total number of combinations. —Answer: 60

Place the following production methods in order starting with the shortest lead time and
moving to the longest lead time.

Assemble-to-order

Make-to-stock
© 2025 All rights reserved

, Engineer-to-order

Make-to-order —Answer: Make-to-stock

Assemble-to-order

Make-to-order

Engineer-to-order

Which of the following is not a step required to make a good?

A. Delivering

B. Sourcing

C. Decoupling

D. Making —Answer: C. Decoupling

True or false: Carrying finished goods inventory is more expensive than carrying raw material
inventory. —Answer: True

Firms that make the customer's product from raw materials, parts, and components are called
—Answer: make-to-order

The number of finished products is usually substantially ____ than the number of components
combined to produce the finished product. —Answer: larger

Which of the following describes the step where parts are procured from one of more suppliers?

A. Delivering

B. Sourcing

C. Decoupling

D. Making —Answer: B. Sourcing

Which type of firm invests in lean manufacturing programs in order to improve customer
service levels for a given inventory investment?

A. Assemble-to-order

B. Make-to-stock

C. Engineer-to-order

D. Make-to-order —Answer: B. Make-to-stock

Which of the following is an example of a product made with a project layout?

A. A refrigerator
© 2025 All rights reserved

Información del documento

Subido en
25 de octubre de 2025
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Passit
3.5
(23)
Vendido
125
Seguidores
6
Artículos
14451
Última venta
1 día hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes