Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 29 páginas
Examen

Virginia Heavy Highway Batch 2 Test all QUESTIONS AND CORRECT ANSWERS LATEST UPDATE THIS YEAR NEW!!

Document preview thumbnail
Vista previa 3 fuera de 29 páginas

click on AVAILABLE IN PACKAGE DEAL to get free bonus exams (SHOP MORE FOR LESS). THANK ME LATER!!

Vista previa del contenido

Page 1 of 29




Virginia Heavy Highway Batch 2 Test all

QUESTIONS AND CORRECT ANSWERS LATEST

UPDATE THIS YEAR NEW!!
Virginia Heavy Highway Batch 2


QUESTION: When performing a dry test for soil strength, what size sample should be used -

ANSWER-1" thick and 6" in diameter




QUESTION: How is level communicated to a machine operator from the ground - ANSWER-Lath




QUESTION: What soil should be considered to be stable - ANSWER-Solid rock




QUESTION: Who is responsible to supply water service to current customers while transferring

service to new lines - ANSWER-The superintendant




QUESTION: Before entering a manhole or confined space - ANSWER-Air quality must be

checked


1

,Page 2 of 29




QUESTION: Who is responsible to open or close a utility main - ANSWER-The utility




QUESTION: When opening a gas main - ANSWER-Any tools used shall be left in the valve in case

of emergency shut off




The ideal moisture content range for an asphault agregate when it is exiting the dryer is -

ANSWER-Less than 0.02%




QUESTION: With what frequency MUST a runway that is cold milled be swept? - ANSWER-Daily

and immediately after milling




QUESTION: What is the size pipe needed when installing a tapping sleeve when making a new

service connection? - ANSWER-2" . Any questions about tapping are probably 2"




QUESTION: If there are cable supports in joint lift manholes, what type of movement must be

allowed? - ANSWER-Cable movement without stress




2

, Page 3 of 29




QUESTION: According to the FAA standard specification, what is the MAXIMUM allowable

square yards of aggregate that can be spread before rolling? - ANSWER-2,000 square yards




QUESTION: What is the best practice when pouring asphault regarding loads? - ANSWER-The

last load at site should not be dumped until the next truck returns




QUESTION: What is the MAX distance between water valves in a municipal water system that

serves high end or industrial areas? - ANSWER-500 feet




QUESTION: Why is the bed of the delivery truck raised to break the bed before dumping into

the paver hopper? - ANSWER-Flood the hopper of the paver to avoid segregation




QUESTION: What can prevent short waves in asphalt paving - ANSWER-make sure the mix is

consistent at the head of the screed




QUESTION: What is the benefit of obtaining compaction density with the paver screed? -

ANSWER-Will reduce differential compaction in low spots and rutted areas


3

Información del documento

Subido en
22 de octubre de 2025
Número de páginas
29
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$24.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
STUVIAGRADES
4.7
(1069)
Vendido
6652
Seguidores
467
Artículos
9116
Última venta
6 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes