S to N [ Ans: ] Downstation
W to E [ Ans: ] Downstation
Stationing [ Ans: ] Starts at 0+00
© 2025 Assignment Expert
Stationing Measurement [ Ans: ] 1+00 is 100 feet
Straight Edge is the [ Ans: ] Measurement of Pavement
smoothness with a 15 foot 4.573 m rolling straightedge
Guru01 - Stuvia
Straight Edge is used to [ Ans: ] identify problems
Random sampling [ Ans: ] Are random numbers generated
usually by a VT for cores to be extracted from the roadway
How often should you calibrate a Straight edge [ Ans: ]
Calibrate at the start of each working period
Using the manual straight edge you find what kind of spot to
place the rolling straightedge? [ Ans: ] Locate a flat area with
the manual straightedge and place the rolling straightedge next
to the manual straightedge and the gauge should read 0
The 3/16 and the 3/8 shims go under which wheels during
calibration [ Ans: ] The outside wheels to measure the low and
the center to measure the high. Gauge should read 3/16 on the
3/16 shim and vice versa for the 3/8 shims. Make sure the center
wheel moves up and down freely.
Calibration materials for Straightedge [ Ans: ] Rolling
Straightedge
Manual Straightedge
Manual Measurement (ruler)
, 2
For Expert help and assignment solutions, +254707240657
x4 3/16 shims 5mm thick
x4 3/8 shims 10mm thick
When to perform final straightedge [ Ans: ] After an entire lane
has been paved
When to perform final straightedge [ Ans: ] Pavement should be
an ambient temperature
You cannot use the straightedge until it has been properly [ Ans:
] calibrated
When performing the straightedge procedure [ Ans: ] Maintain
proper traffic management and safety
© 2025 Assignment Expert
Cross slopes can be either done [ Ans: ] Manually or with a smart
level
When using a manual cross slope you first [ Ans: ] Place a simple
level on pavement
Guru01 - Stuvia
After placing the simple level on the pavement then you [ Ans: ]
Raise the down end of the level until it is level (bubble center)
After the simple level is lifted until it is level you measure what [
Ans: ] The length of the simple level and the height between the
(previously down) end of the level to the pavement
Formula to calculate the manual cross slope [ Ans: ] Calculate
the slope using the formula
( h / l ) x 100 = slope %
Requirements for the rolling Straightedge [ Ans: ] Must have a
read out gauge, kept clean and in working order, low and high
reading, and marks to the nearest 1/16 (1mm)
Rolling Straightedge pulled at [ Ans: ] 3 to 5mph or less
Deficiencies pointed out with rolling straightedge you should first [
Ans: ] Mark the pavement at the center wheel where the needle
initially shows a deficiency and where is ends. Also record location
and measurements of deficiency.
For Expert help and assignment solutions, +254707240657
FDOT Asphalt Paving Level 1 Questions
and Answers (100% Correct Answers)
Already Graded A+
S to N [ Ans: ] Downstation
W to E [ Ans: ] Downstation
Stationing [ Ans: ] Starts at 0+00
© 2025 Assignment Expert
Stationing Measurement [ Ans: ] 1+00 is 100 feet
Straight Edge is the [ Ans: ] Measurement of Pavement
smoothness with a 15 foot 4.573 m rolling straightedge
Guru01 - Stuvia
Straight Edge is used to [ Ans: ] identify problems
Random sampling [ Ans: ] Are random numbers generated
usually by a VT for cores to be extracted from the roadway
How often should you calibrate a Straight edge [ Ans: ]
Calibrate at the start of each working period
Using the manual straight edge you find what kind of spot to
place the rolling straightedge? [ Ans: ] Locate a flat area with
the manual straightedge and place the rolling straightedge next
to the manual straightedge and the gauge should read 0
The 3/16 and the 3/8 shims go under which wheels during
calibration [ Ans: ] The outside wheels to measure the low and
the center to measure the high. Gauge should read 3/16 on the
3/16 shim and vice versa for the 3/8 shims. Make sure the center
wheel moves up and down freely.
Calibration materials for Straightedge [ Ans: ] Rolling
Straightedge
Manual Straightedge
Manual Measurement (ruler)
, 2
For Expert help and assignment solutions, +254707240657
x4 3/16 shims 5mm thick
x4 3/8 shims 10mm thick
When to perform final straightedge [ Ans: ] After an entire lane
has been paved
When to perform final straightedge [ Ans: ] Pavement should be
an ambient temperature
You cannot use the straightedge until it has been properly [ Ans:
] calibrated
When performing the straightedge procedure [ Ans: ] Maintain
proper traffic management and safety
© 2025 Assignment Expert
Cross slopes can be either done [ Ans: ] Manually or with a smart
level
When using a manual cross slope you first [ Ans: ] Place a simple
level on pavement
Guru01 - Stuvia
After placing the simple level on the pavement then you [ Ans: ]
Raise the down end of the level until it is level (bubble center)
After the simple level is lifted until it is level you measure what [
Ans: ] The length of the simple level and the height between the
(previously down) end of the level to the pavement
Formula to calculate the manual cross slope [ Ans: ] Calculate
the slope using the formula
( h / l ) x 100 = slope %
Requirements for the rolling Straightedge [ Ans: ] Must have a
read out gauge, kept clean and in working order, low and high
reading, and marks to the nearest 1/16 (1mm)
Rolling Straightedge pulled at [ Ans: ] 3 to 5mph or less
Deficiencies pointed out with rolling straightedge you should first [
Ans: ] Mark the pavement at the center wheel where the needle
initially shows a deficiency and where is ends. Also record location
and measurements of deficiency.