WITH SOLUTIONS GRADED A+
✔✔Not later than the _____th day after the date on which MRC completes mold
remediation at the property the MRC shall provide a certificate of Mold remediation to
the property owner. - ✔✔10
✔✔True / False: A license holder may perform both mold assessment and mold
remediation on the same project. - ✔✔False
✔✔How many years shall MRC maintain records for each mold remediation project? -
✔✔3 Years
✔✔What are the 4 record requirements each mold remediation project needs? - ✔✔1.
Before and after photographs of the project.
2. Written Contract between all parties.
3. Invoices regarding mold remediation.
4. any other material required by the department.
✔✔Not later than the ____th day after the date of completion of the mold remediation,
the MRC shall provide the owner with copies of all photographs. - ✔✔10
✔✔When is the property owner not liable for damages related to mold remediation on
property? - ✔✔A certificate of mold remediation has been issued for the property and
the damages accorded on or before the date of the issued certificate.
✔✔Define contiguous - ✔✔In close proximity; neighboring.
✔✔What does TDLR stand for? - ✔✔Texas Department of Licensing Regulation
✔✔Define Mold Remediation - ✔✔The removal, cleaning, sanitizing, demolition, or other
treatment including preventative activities, of mold contaminated matter that was not
purposely grown at a location.
✔✔What is a Mold Remediation Protocol? - ✔✔Mold remediation work analysis - A
document prepared by a licensed mold assessment consultant for a client that specifies
the estimated quantities and locations of materials to be remediated and the proposed
remediation methods.
✔✔Who issues MCR License? - ✔✔Texas Department of Licensing Regulation
✔✔Who provides the Mold Remediation Protocol? - ✔✔A Licensed Mold Assessment
Consultant
, ✔✔What is a Mold Remediation Work Plan? - ✔✔A document prepared by MRC that
provides specific instructions and or standard operating procedures for how a mold
remediation project will be performed.
✔✔Monday through Friday, including holidays that fall on those days are referred to
as.... - ✔✔Working Days
✔✔The date on which mold remediation begins is called... - ✔✔Start-Date
✔✔True / False: Preparation work is not considered mold remediation. - ✔✔True
✔✔What is the Mold Remediation Worker Registration or Renewal Fee? - ✔✔$50.00
✔✔What is the Mold Remediation Contractor License or Renewal Fee? - ✔✔$450.00
✔✔What is the Mold Remediation Company License or Renewal Fee? - ✔✔$850.00
✔✔What is the Emergency Mold Notification Fee? - ✔✔$25.00
✔✔What does CMIS stand for? - ✔✔Consumer Mold Information Sheet
✔✔What does MAC stand for? - ✔✔Mold Assessment Consultant
✔✔True / False: MRC and MAC are required to give a copy of the CMIS to each client
and to the property owner, if not the same person, before starting any mold-related
activity. - ✔✔True
✔✔Not later than ____ calendar days after the project stop-date, the MRC shall provide
the property owner with copies of required photographs of the scene of the mold
remediation taken before and after the remediation. - ✔✔7
✔✔Not later than ____ calendar days after the project stop-date, the MRC shall provide
the property owner a Certificate of Mold Damage Remediation . - ✔✔10
✔✔Who needs to sign the Certificate of Mold Damage Remediation? - ✔✔MRC and
MAC
✔✔What 4 types of Toxigenic Mold species are known to produce mycotoxins? - ✔✔1.
Stachybotrys
2. Aspergillus
3. Penicillium
4. Fusarium