MGMT 339 CHAPTER 7 PROJECT MANAGEMENT EXAM AND ACTUAL ANSWERS.

Puntuación
-
Vendido
-
Páginas
2
Grado
A+
Subido en
07-10-2025
Escrito en
2025/2026

Project - Answer an Interrelated set of activities with a definite starting and ending point, which results in a unique outcome for a specific allocation of resources. Project Management - Answer A systemized, phased approach to defining, organizing, planning, monitoring and controlling projects. Program - Answer An interdependent set of projects that have a common strategic purpose. work breakdown structure (WBS) - Answer A statement of all work that has to be completed. activity - Answer The smallest unit of work effort consuming both time and resources that the project manager can schedule and control. network diagram - Answer A network planning method, designed to depict the relationships between activities, that consist of nodes (circles) and arcs (arrows). program evaluation and review technique (PERT) - Answer A network planning method created for the U.S. Navy's Polaris missile project in the 1950's, which involved 3,000 separate contractors and suppliers. Critical Path Method (CPM) - Answer A network planning method developed in the 1950's as a means of scheduling maintenance shutdowns at chemical-processing plants. precedence relationship - Answer A relationship that determines a sequence for undertaking activities; it specifies that one activity cannot start until a preceding activity has been completed. Path - Answer The sequence of activities between a projects start and finish. Critical Path - Answer The sequence of activities between projects start and finish that takes the longest time to complete. earliest finish time (EF) - Answer An activitys earliest stat time plus its estimated duration, t, or EF = ES + t.

Mostrar más Leer menos








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Información del documento

Subido en
7 de octubre de 2025
Número de páginas
2
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Vista previa del contenido

MGMT 339 CHAPTER 7 PROJECT
MANAGEMENT EXAM AND ACTUAL
ANSWERS.
Project - Answer an Interrelated set of activities with a definite starting and ending point,
which results in a unique outcome for a specific allocation of resources.



Project Management - Answer A systemized, phased approach to defining, organizing,
planning, monitoring and controlling projects.



Program - Answer An interdependent set of projects that have a common strategic purpose.



work breakdown structure (WBS) - Answer A statement of all work that has to be completed.



activity - Answer The smallest unit of work effort consuming both time and resources that the
project manager can schedule and control.



network diagram - Answer A network planning method, designed to depict the relationships
between activities, that consist of nodes (circles) and arcs (arrows).



program evaluation and review technique (PERT) - Answer A network planning method
created for the U.S. Navy's Polaris missile project in the 1950's, which involved 3,000 separate
contractors and suppliers.



Critical Path Method (CPM) - Answer A network planning method developed in the 1950's as a
means of scheduling maintenance shutdowns at chemical-processing plants.



precedence relationship - Answer A relationship that determines a sequence for undertaking
activities; it specifies that one activity cannot start until a preceding activity has been
completed.



Path - Answer The sequence of activities between a projects start and finish.




Critical Path - Answer The sequence of activities between projects start and finish that takes

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TestSolver9 Webster University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
756
Miembro desde
2 año
Número de seguidores
125
Documentos
24874
Última venta
2 días hace
TESTSOLVER9 STORE

TOPNOTCH IN LEARNING MATERIALS,(EXAMS,STUDYGUIDES NOTES ,REVIEWS,FLASHCARDS ,ALL SOLVED AND PACKAGED.OUR STORE MAKE YOUR EDUCATION JOURNEY EFFICIENT AND EASY.WE ARE HERE FOR YOU FEEL FREE TO REACH US OUT .

3.6

133 reseñas

5
60
4
19
3
22
2
9
1
23

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes