• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 9 páginas
Examen

QISP Module 1 Quizzes with Complete Solutions

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

QISP Module 1 Quizzes with Complete Solutions

Vista previa del contenido

QISP Module 1 Quizzes with Complete
Solutions

Which of the following is a Discharger's responsibility for the Off-Site Compliance Option
agreement submittal schedule? - Answer- Discharger must certify and submit an
updated SWPPP at least 7 days prior to initial agreement implementation.

Which existing infiltration basins must be retrofitted to meet the On-Site Compliance
Option? - Answer- Only existing basins where the Discharger chooses to pursue the
On-Site Compliance Option and where the basins do not currently meet all the
requirements for the On-Site Compliance Option.

Where can a BMP that is designed to meet the Off-Site Compliance Option sizing be
located? - Answer- Any location where industrial discharges enter the Off-Site BMP
prior to reaching a water of the State or United States


True or False: A discharger is required to monitor for industrial pollutants present at the
facility with the potential to discharge regardless of whether the immediate receiving
water body is impaired for the same pollutant. - Answer- true

True or False: SMARTS will not provide a list of impairments in the HUC10 of a
discharger - Answer- false

Fill in the blank: The determination of whether or not a facility is located within a
particular HUC 10 watershed is a part of the process for the initial ________________
______________ ______________ - Answer- pollutant source assessment

Where can the 303(d) list of impaired water bodies be found? - Answer- Appendix 3 of
the IGP

True or false: if a waterbody has 303(d) listed impairment(s), a discharger must sample
for the impairment(s) no matter what - Answer- False. Facilities are not required to
sample for a certain impairment if the industrial activity done there are unlikely
contributors.

A discharger is part of a facility that is unlikely to contribute pathogens to a receiving
water listed as impaired for pathogens via 303(d) water bodies list. In which scenario
would they have to sample for pathogens? - Answer- If pathogens were identified in
their pollutant source assessment.

, A new discharger is applying for NOI coverage. What are the three situations in which
they would be considered "discharging directly to a 303(d) impaired water body" -
Answer- 1. Directly discharging to an impaired water body
2. directly discharging to an impaired reach
3. discharges through an MS4 conveyance that directly discharges to a 303(d) listed
water body.

True or false: If a facility is discharging to a tributary that is not 303(d) listed as impaired,
then they are not discharging to a 303(d) listed impaired water body - Answer- True,
even if that tributary eventually contributes to a reach that is listed as impaired

what three things do NOT disqualify a QSE nor negate the discharger's responsibilities
for sampling the required number of QSE's? - Answer- 1. inappropriate sample
collection
2. lack of qualified staff
3. laboratory error

True or False: an employee parking lot qualifies as an industrial activities location -
Answer- false

Fill in the blank: The discharger may authorize an analytical laboratory to combine
samples of equal volume from as many as _____ discharge locations within a drainage
area - Answer- 4

Dischargers may utilize qualified combined samples only if: (3 qualifiers) within each of
the drainage areas are substantially similar to one another - Answer- 1. industrial
activities
2. BMPs
3. physical characteristics

What does it mean if a discharge location is commingled? - Answer- The sampling
location of that discharge will contain stormwater or run-on from outside the facility/from
non industrial sources

How long can you wait between start of discharge and time of sample collection? -
Answer- no more than four hours

he Advanced BMPs section of the IGP directly cites - Answer- infiltration, reuse,
containment and volume reduction BMPs as advanced.

Two main factors in determining if a spill or leak is significant is ____. Significant leaks
must be reported in the SWPPP for the past 5 years - Answer- 1) the potential of a
discharge and 2) the ability to immediately clean up the spill or leak prior to the
discharge or commingling with storm water.

Información del documento

Subido en
7 de octubre de 2025
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Scholarsstudyguide
3.8
(169)
Vendido
849
Seguidores
476
Artículos
16375
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes