Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 14 páginas
Examen

Metro Questions and answers rated A+

Document preview thumbnail
Vista previa 2 fuera de 14 páginas

Metro Questions and answers rated A+

Vista previa del contenido

Metro Questions and answers rated A+

When is it acceptable to touch the third rail? - correct answer ✔✔ Never touch the third rail
even after being confirmed down



Approximately how far is every rail roadway emergency access gate - correct answer ✔✔ 800
feet



In Virginia metro stations and tunnels standpipes are every ___ feet? - correct answer ✔✔ 200
feet



The strategy for managing a metro emergency is ____? - correct answer ✔✔ ACRE



What should be place approximately 750 feet from both sides of the incidents? - correct answer
✔✔ Flagger



What shall flaggers have with them? - correct answer ✔✔ Portable radio, Reflective clothing,
Flashlight/flare



The primary responsibility of the first due engine along with the first due _____ is to conduct
reconnaissance. - correct answer ✔✔ Truck



The WSAD may begin alarming at __ to __ volts. - correct answer ✔✔ 50 to 60



What is the response for an EMS emergency on the rail roadway? - correct answer ✔✔ 1
ALS/BLS unit, 1engine, 1 Truck, 1 Rescue, 1 Battalion Chief, 1 EMS Supervisor

, The _____ is the central focal point and control point for the station - correct answer ✔✔ Kiosk



The primary responsibility of the second engine on a rail roadway incident? - correct answer
✔✔ Assist the 1st due engine



The primary responsibility of the third engine on a rail roadway incident? - correct answer ✔✔
Coordinate water supply



Chain markers are place every ___ feet along the entire rail roadway. - correct answer ✔✔ 100
Feet



What happens to escalators if the fire alarm in in full activation? - correct answer ✔✔ In bound
stops and out bound continues



Where are Knox rapid entry box found at all metro stations - correct answer ✔✔ First flat wall to
the right of the main entrance



Who assumes control of the emergency ventilation fans? - correct answer ✔✔ Incident
Commander



All metro car window a held in place by____? - correct answer ✔✔ Rubber zip strip



What rail car doors can be opened with the XX Barrel key - correct answer ✔✔ End doors, 2, 8
and 9



Vent shaft are always within ____ feet of a substations end. - correct answer ✔✔ 100



How many volts DC does the 3rd rail supply? - correct answer ✔✔ 750

Información del documento

Subido en
2 de octubre de 2025
Número de páginas
14
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$22.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BravelRadon
3.5
(164)
Vendido
952
Seguidores
541
Artículos
52850
Última venta
1 semana hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes