MSSC Maintenance test 1 Questions and
Correct Answers/ Latest Update / Already
Graded
What is an accelerometer used for?
- Temperature measurement
- Acoustic monitoring
- Vibration measurement
- Oil analysis
Ans: Vibration measurement
Corrective work is performed following preventive maintenance when
__________.
- The schedule calls for it
- The supervisor requests it
- The PM work was performed incorrectly
- Problems are discovered
Ans: Problems are discovered
Slips and falls are the worst safety hazards when __________.
- Cleaning fans
All rights reserved © 2025/ 2026 |
, Page |2
- Mopping floors
- Lifting heavy objects
- Driving a tug
Ans: Mopping floors
Supply errors can be caused by relying on __________ without
monitoring their performance.
- Customers
- Employees
- Suppliers
- Inspectors
Ans: Suppliers
Preventive maintenance is best described as what?
- Periodic in nature
- Exhausting
- Breakdown repair
- Flexible
Ans: Periodic in nature
All rights reserved © 2025/ 2026 |
, Page |3
A board with tool outlines for placement is called a __________ and is a
good way to make sure tools are returned to their proper storage space
between uses.
- Storyboard
- Shadow board
- Board of tools
- Storage bin
Ans: Shadow board
The frequency of maintenance is usually an item found on the
__________.
- Preventive maintenance schedule
- Work order
- Warranty card
- Hold card
Ans: Preventive maintenance schedule
A maintenance technician should arrange to have all routine tools and
supplies ready to perform preventive maintenance on a machine in
order to __________.
- Increase equipment downtime
All rights reserved © 2025/ 2026 |
, Page |4
- Minimize equipment downtime
- Make sure that the job is done correctly
- Make sure that the machine parts are still available
Ans: Minimize equipment downtime
Placing tools and equipment where they can be reached with minimal
strain is a characteristic of a __________.
- Poorly designed workstation
- Well-designed workstation
- Old style workstation
- Pull system
Ans: Well-designed workstation
What can be done after a corrective action form is completed?
- The form is saved in a safe and secure place.
- The maintenance technician reviews the work order.
- The supervisor is summoned to determine whether the job is
complete.
- Preventive maintenance should be documented as completed.