Questions and CORRECT Answers
The consists of daily checks of the work to
Follow-up Phase
assure continuing compliance with contract requirements
The QC Manager to be in place and take an active role in
Design-Build contracts require
the review and coordination of the design.
Which of the following is included in all three phases of
Safety
the Three Phases of Control?
Achieve the quality established by properly developed re-
The purpose of Construction Quality Management is to quirements through the combined responsibility, but sep-
arate, efforts of contractors and government personnel
Testing is extremely important in construction quality
Both the contractor and the government
management and is performed by
Require the contractor to plan, schedule, and perform
The primary purpose of the Three-Phase Control System
quality management actions to assure work meets all
is to
specified quality standards
Require the contractor to maintain the quality specified in
Quality Assurance Personnel have the responsibility to
the plans and specifications
The is the appropriate time to as-
sure that all materials and/or equipment have been test- Preparatory Phase
ed, submitted, and approved
The Preconstruction Conference and Coordination and Conducted prior to the commencement of any physical
Mutual Understanding Meeting Are construction work
Are specified in the technical specs, outlined in the QCP,
Contractor testing procedures: and addressed at Coordination and Mutual Understand-
ing Meeting
Identification of individual quality quality control person-
The Quality Control Plan contains nel, including name, qualifications, assigned duties, re-
sponsibilities and authorities.