Verified Questions & Correct Solutions
Description:
Complete NCCCO Tower Crane Certification Exam study guide updated for 2025/2026. Includes
verified questions and correct solutions covering OSHA safety standards, crane operations, load
charts, signaling, and inspection procedures. Essential for crane operators seeking NCCCO tower
crane certification with guaranteed success.
Keywords:
NCCCO tower crane exam 2025
crane operator certification test prep
tower crane safety exam questions
NCCCO load chart study guide
NCCCO exam solutions 2026
Site and Setup (Questions 1-20)
1. Who is typically responsible for determining the crane's set-up location on a site?
A) The Crane Operator
B) The Signal Person
C) The Project Manager
D) A Qualified Rigger
Answer: B) A Qualified Rigger
,2. What is the primary purpose of outriggers or crawlers on a mobile tower crane?
A) To increase lifting capacity
B) To provide a stable base and distribute load
C) To make the crane easier to transport
D) To allow for faster hoisting
Answer: B) To provide a stable base and distribute load
3. Before assembly begins, what must be checked regarding the crane's foundation or
support?
A) The weather forecast
B) That it is designed and constructed to handle all intended loads
C) The color of the concrete
D) The proximity to power lines
Answer: B) That it is designed and constructed to handle all intended loads
4. What critical document outlines the assembly, disassembly, and jump procedures for a
specific tower crane?
A) The OSHA Log 300
B) The Manufacturer's Operator Manual
C) The Site Safety Plan
D) The Lift Director's Notes
Answer: B) The Manufacturer's Operator Manual
,5. When "jumping" (adding a section to) a climbing tower crane, what is a key safety
responsibility of the operator?
A) To direct the crew from the ground
B) To ensure the crane is properly balanced and unloaded
C) To weld the new section in place
D) To operate the crane at its maximum rated capacity
Answer: B) To ensure the crane is properly balanced and unloaded
6. What is the minimum safe distance a crane's boom should maintain from energized power
lines up to 50 kV?
A) 10 feet
B) 20 feet
C) 50 feet
D) 100 feet
Answer: A) 10 feet
7. A crane's load chart is based on the crane being:
A) On a slope of 1 degree
B) Level and on a firm, stable surface
C) On soft ground with outriggers fully extended
D) Operated by an experienced operator
Answer: B) Level and on a firm, stable surface
, 8. Who has the final authority to start assembly or disassembly operations if weather
conditions become unsafe?
A) The Project Manager
B) The Assembly Crew Foreman
C) The Crane Operator
D) The Signal Person
Answer: C) The Crane Operator
9. What must be done before operating a tower crane near a newly constructed wall?
A) Paint the wall a bright color.
B) Ensure the wall's stability and ability to withstand crane loads.
C) Have a signal person stand on the wall.
D) Nothing, walls do not affect crane operations.
Answer: B) Ensure the wall's stability and ability to withstand crane loads.
10. The swing radius of the crane's counterweight poses a risk of striking:
A) Only the operator
B) Pedestrians and objects within the arc
C) Only other cranes
D) Nothing; it is safely enclosed
Answer: B) Pedestrians and objects within the arc
11. What is the purpose of a "fall zone" during assembly/disassembly?
A) A zone where tools can be dropped safely.