1|Page
Maintenance Study Guide Questions and Answers with 100%
Complete Solutions UPDATED!!!
Often, the employee closing out the PM work order verifies that
- ANSWER preventative maintenance is complete
Preventative maintenance schedules would commonly include -
ANSWER frequency
Making sure that a motor shaft is level - ANSWER reduces the
number of needed shims
It is important to have a/an _______ for closure of PM work
orders - ANSWER completion date
Which of the following is a goal of Total Productive
Maintenance (TPM) - ANSWER zero breakdowns and defects
When checking for out of round, any movement of the dial
indicates that the - ANSWER shaft may be out of round
, 2|Page
A machine is expected to have downtime throughout several
shifts. What is the appropriate communication between shifts
for lock out/tag out procedures? - ANSWER verify energy state,
then change lock
A chain should be replaced when its length becomes ______
longer than the original length - ANSWER 3 percent
When lubricating a bearing, the WORST mistake would be to -
ANSWER get dirt in the bearing
The most obvious indicator that V-belt pulleys are worn beyond
usefulness is when the - ANSWER belt is touching the bottom of
the groove
Prior to shutting down a machine for preventative maintenance,
the maintenance technician must - ANSWER arrange for ready
access of routine tools and supplies
Maintenance Study Guide Questions and Answers with 100%
Complete Solutions UPDATED!!!
Often, the employee closing out the PM work order verifies that
- ANSWER preventative maintenance is complete
Preventative maintenance schedules would commonly include -
ANSWER frequency
Making sure that a motor shaft is level - ANSWER reduces the
number of needed shims
It is important to have a/an _______ for closure of PM work
orders - ANSWER completion date
Which of the following is a goal of Total Productive
Maintenance (TPM) - ANSWER zero breakdowns and defects
When checking for out of round, any movement of the dial
indicates that the - ANSWER shaft may be out of round
, 2|Page
A machine is expected to have downtime throughout several
shifts. What is the appropriate communication between shifts
for lock out/tag out procedures? - ANSWER verify energy state,
then change lock
A chain should be replaced when its length becomes ______
longer than the original length - ANSWER 3 percent
When lubricating a bearing, the WORST mistake would be to -
ANSWER get dirt in the bearing
The most obvious indicator that V-belt pulleys are worn beyond
usefulness is when the - ANSWER belt is touching the bottom of
the groove
Prior to shutting down a machine for preventative maintenance,
the maintenance technician must - ANSWER arrange for ready
access of routine tools and supplies