Visual tool for planning and scheduling a "simple" project.
• Gantt
A hierarchical listing of what must be done during a project.
Work breakdown structure
The primary tool for determining the time and flow of a project is:
PERT
Measuring the outcome of a paint job on your car would be qualitative or quantitative?
Qualitative
Select the three metrics that are used for project management. How do we measure
ourselves?
Cost
• Time
Performance objective
Extra capacity used to offset demand uncertainty.
Capacity cushion
Expresses in current value the sum of all future cash flows of an investment proposal.
Present value
, When using cost-volume analysis we assume everything produced can be sold.
True
Which financial analysis includes initial cost, expected annual cash flows, estimated future
salvage value in an equivalent interest rate?
Payback
Select the tools for evaluating capacity alternatives.
Financial Analysis
• Decision theory
Cost-volume analysis
Limits the performance of a process or system in achieving its goals.
Constraint
Just-in-time (JIT) does not apply to services. It only applies to production.
False
Six sigma is a lean tool.
True
Poka-yoke is a fail-safe method which is focused on which of the following?
Mistake-proofing
Lean operations does not include quality
false
Correct Verified Solutions
Visual tool for planning and scheduling a "simple" project.
• Gantt
A hierarchical listing of what must be done during a project.
Work breakdown structure
The primary tool for determining the time and flow of a project is:
PERT
Measuring the outcome of a paint job on your car would be qualitative or quantitative?
Qualitative
Select the three metrics that are used for project management. How do we measure
ourselves?
Cost
• Time
Performance objective
Extra capacity used to offset demand uncertainty.
Capacity cushion
Expresses in current value the sum of all future cash flows of an investment proposal.
Present value
, When using cost-volume analysis we assume everything produced can be sold.
True
Which financial analysis includes initial cost, expected annual cash flows, estimated future
salvage value in an equivalent interest rate?
Payback
Select the tools for evaluating capacity alternatives.
Financial Analysis
• Decision theory
Cost-volume analysis
Limits the performance of a process or system in achieving its goals.
Constraint
Just-in-time (JIT) does not apply to services. It only applies to production.
False
Six sigma is a lean tool.
True
Poka-yoke is a fail-safe method which is focused on which of the following?
Mistake-proofing
Lean operations does not include quality
false