This document provides the most recent updated version of the Virginia HIC (Home Improvement Contractor) License Exam with verified correct answers. It covers essential knowledge areas including Virginia state laws and regulations, business management, contract requirements, building codes, safety standards, estimating and bidding, project management, and customer relations. Designed to meet Virginia DPOR licensing standards, this resource is an excellent study tool for candidates preparing for the Home Improvement Contractor License exam.

Mostrar más Leer menos
Institución
Virginia HIC License
Grado
Virginia HIC License

Vista previa del contenido

Virginia HIC (Home Improvement Contractor)
License EXAM LATEST UPDATED VERSION
QUESTIONS AND VERIFIED CORRECT ANSWERS JUST
RELEASED
The bottom of a siding or soffit panel, or accessory piece, opposite the nail hem, which
locks onto the preceding panel is called the: - answer>>>buttlock


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 1


Where installing a soffit on an open rafter, a soffit panel is to be cut to fit into the slots of
the F-channel. How much should be allowed per side for expansion? - answer>>>1/4"


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 9


Corrosion resistant, self-tapping type, _______ truss head or pan head length sufficient
to penetrate wall thickness of steel stud or 3⁄4 in. into framing or furring should be used
with rigid PVC siding. - answer>>>No. 8


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 3


Changes in temperature cause vinyl siding and accessories to expand and contract as
much as _______ over a 12 foot length. - answer>>>1/2"


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 4

,When installing inside and outside corner posts for vertical siding, leave a _______ gap
between the top of the corner post and soffits or eaves. - answer>>>1/4"


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 7


Do not store vinyl siding material in any location or in any manner where the
temperature of the siding, soffit or accessories is likely to exceed: - answer>>>130 F


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 2


Which of the following is a flat material used on the face of the house, applied between
the studs and the siding (or over existing wall surface) to provide an even surface for the
installation of the vinyl siding? - answer>>>backerboard


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 1


When installing fascia, measure the cover required, cut the fascia the proper width, and
punch snaplock "ears" every _______along the top of the fascia using a snaplock punch. -
answer>>>6"


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 10


If installing siding during weather colder than 40°F, increase the minimum clearance to
_______ in. between the ends of panels and trim and any receiver such as J-channels and
corner poststo allow for additional expansion during warmer weather. - answer>>>3/8 in.


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 3

,When applied, vinyl siding products must be attached "loosely," leaving approximately a
_______ inch space between the vinyl and the fastener head or crown to permit thermal
movement. - answer>>>1/32 inch


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 4


What color markings would indicate the location of underground Gas lines? -
answer>>>High Visibility Safety Yellow


CFR Part 1926 and Related Standards - Page 10


What is the requirement for digging or excavating within 2 feet of a marked underground
utility line? - answer>>>All the above


CFR Part 1926 and Related Standards - Page 10


When may a protective system be eliminated in a trench that is less than five feet in
depth? - answer>>>When an examination of the ground by a competent person is
performed


CFR Part 1926 and Related Standards - Page 103


What is the greatest opening that may be cut in a floor for the disposal of materials? -
answer>>>25 percent of the aggregate of the total floor area


CFR Part 1926 and Related Standards - Page 107

, What is the support requirement for a retaining wall against which debris will be piled? -
answer>>>They shall not be used unless capable of safely supporting the imposed load


CFR Part 1926 and Related Standards - Page 108


What are the responsibilities of the qualified person related to employees working in a
confined space? - answer>>>Test the confined space immediately prior to entry


CFR Part 1926 and Related Standards - Page 12


When constructing an underground tunnel, what procedure is an employer required to
do regarding employee entering and leaving? - answer>>>Maintain a check-in/check-out
procedure to ensure head count


CFR Part 1926 and Related Standards - Page 13 & 14


What are the requirements regarding portable drinking water containers? - answer>>>All
the above


CFR Part 1926 and Related Standards - Page 16


How many toilets and handwashing facilities are required for 20 employees? -
answer>>>One toilet and one handwashing facility


CFR Part 1926 and Related Standards - Page 17

Escuela, estudio y materia

Institución
Virginia HIC License
Grado
Virginia HIC License

Información del documento

Subido en
2 de septiembre de 2025
Número de páginas
59
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$19.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
dennohz2000 Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
350
Miembro desde
2 año
Número de seguidores
46
Documentos
7771
Última venta
1 semana hace

4.0

81 reseñas

5
46
4
10
3
11
2
4
1
10

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes