What are the primary ingredients of a contract? - Answer -Mutual agreement, Capacity,
Consideration, Lawfulness

From an owners perspective a cost plus fee contract is the riskiest of all types of
contracts. - Answer -True

One way to reduce owners risk is to have a cap on the contract of a project. This is an
example of which type of contract? - Answer -Cost Plus with a GMP

According to Dykstra what issues impact the choice of contract? - Answer -The project
delivery method, Risk allocation, The quality of design information

The key to mutual agreement is that all parties agree to exactly what is written in the
contract documents. - Answer -True

The following is an example of which type of contract? A contractor bids a fixed unit
price and the completion of work is paid based on actual quantities. - Answer -Unit
Price

Contract documents include many components except which of the following? - Answer
-Change Orders

Specifications complement drawings by answering several key information
requirements. Select all of the following applicable areas that specifications address. -
Answer -Submittals, Quality of material and products and quality assurance, Special
installation requirements

General conditions are standards that can be used on multiple projects and are
provided with the agreement. General conditions outline and specify how many Key
provisions including which of the following? - Answer -Outline broad rights and
responsibilities of the parties, Outline terms for making changes to the work, Provide
guidance for dealing with disputes or delays, Specify the procedures for contractor
payment

The agreement is one of the documents that make up a contract and is sometimes
referred to as the contract because it includes by reference all the other documents. -
Answer -Address of the project and brief description of the work, List of documents
referenced by the agreement, Time for completion and contractor exclusions

GC's develop a rough schedule called a "big schedule" And as a part of preparing their
bid. They refine this as a "master construction schedule" with more detail after they are
awarded the job. - Answer -True

, Preconstruction include several activities orchestrated by the project manager and
superintendent which of the following are considered pre-construction activities? -
Answer -Job-site layout plan, Permits, Buying out the job, Adjusting the bid estimate

Plans and drawings tell the General Contractor what needs to be done. The GC is
responsible for deciding how to do the job. - Answer -True

Preconstruction submittals include certificates of insurance. Select all the various forms
of insurance a General Contractor would need to submit among the following. - Answer
-Property damage insurance,
General liability insurance, Builders risk insurance

Submittals include product information, samples, and mock ups that demonstrate the
way in which the GC intends to conform with contract requirements. - Answer -True

The general contractors are responsible for many services and tasks during
construction. Select all of the following included among these. - Answer -Coordination
of test and inspections required by the law and contract, Maintaining a clean and safe
job site, Management of subconscious, Payment for all project related labor and
materials

And when selecting subcontracts, the GC should consider three broad criteria that
include the following. Select all that apply. - Answer -Trade competency, Price,
Business competency

Bid shopping is an ethical practice of sharing contract bids to achieve the best price. -
Answer -False

Change orders are a modification to the written agreement between the owner and the
GC. They are additive or deductive to the contract documents. - Answer -True

The change order process often starts with a question on the job by a sub to GC. This
"field question" is either addressed by the GC or submitted to the architect as a "request
for information." What are the following steps for processing changes and work? -
Answer -Change proposal, Request for change proposal, Change order

And what is the mechanism for the owner to make change directives and minor
changes at work, even if the GC doesn't agree? - Answer -Construction Change
Directive (CCD)

There are many good reasons why scheduling is an important part of project
management, as it assists contractors in providing value in several ways except which
of the following? - Answer -Drive subcontractor quality performance

Select all of the following types of schedules that are common in construction project
management. - Answer -Bar charts, Network diagrams, Network bar charts

Información del documento

Subido en
30 de agosto de 2025
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA
3.8
(366)
Vendido
2162
Seguidores
1449
Artículos
60417
Última venta
10 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes