During reactive testing, which entity must give approval to change an approved voltage
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
schedule? |||\\\
PJM, TOP, MOC, GO - correct answersTO|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Generation available within 10 minutes for offline reserve units: |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Quick-start (hydro), manual, operating, supplemental - correct answersQuick-start (hydro)
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Minimum MVARs for an individual generator that is required to do reactive testing? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answers20 MVA |||\\\
Minimum MVARs for an aggregate of generators that is required to do reactive testing? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answers75 MVA |||\\\ |||\\\ |||\\\
Power transformer is connected to the generator with which line? - correct answersPrimary
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
In a balancing authority region, If a site trips offline, what increases? - correct answerspositive
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
time error |||\\\
How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answers6 hrs |||\\\ |||\\\ |||\\\
How does PJM avoid dealing with economic issues during transmission related constraints -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answerscost (offer) capping generation |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
If a generator doesn't have ICCP, what does it have to be linked through so data is available? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answersSCADA (through EMS) |||\\\ |||\\\ |||\\\ |||\\\
,Which balancing control mode is used by PJM under normal operations? - correct answersTie
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
line bias |||\\\
the purpose for balancing area to have AR (area regulator) is to correct for: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answerssmall deviations in load |||\\\ |||\\\ |||\\\
what esuite tool is used to maintain individual generator regulation data that is submitted by
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
PJM members? - correct answerseMarket
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\
cold weather alert is for what temp? - correct answers10F
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
what are the three types of transmission constraint that PJM monitors? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answersReactive, Stability, Thermal (transfer limits) |||\\\ |||\\\ |||\\\ |||\\\
which would be the last step PJM would take in attempting to relieve a transmission
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
constraint? - correct answersshed load |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Load in PJM is generally served using ___ transmission service. - correct answersNetwork
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Integration
If you were going to import, export, or wheel power through PJM, you would use ____
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
transmission services? - correct answerspoint-to-point? |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
what is an example of a quick start reserve? - correct answersHydroelectric
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
In order to lower system voltage, ___ must decrease to decrease _____ - correct answersMW,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
MVAR
, what is PJM's reg requirement during a system restoration? - correct answers2% of current
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
load
During restoration conditions, what amount of load must be shed in order to increase
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
frequency by 1.0Hz - correct answers6-10% |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
During restoration conditions, what percentage of load must be shed in order to alter
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
frequency by 1% Hz? - correct answers1-2% of load to alter frequency by 1% |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
What is the approx. MVAR per mile of 500kV transmission that should be anticipated? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answers1.70 MVAR per mile
|||\\\ |||\\\ |||\\\ |||\\\
Frequency during restoration process should be: - correct answers59.75-61Hz |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A system will blackout at what frequency? - correct answers57.5 Hz or lower
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
What is the criteria for PJM to issue a Min Gen Alert? - correct answersWithin 2500 MW of
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
normal eco min limits |||\\\ |||\\\ |||\\\
Based on a generator capability curve, in order to maximize the MVAR output of the generator,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
it may be necessary to: - correct answersdecrease MW output
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
It would be an acceptable action for PJM to request of a generator during periods of heavy
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
flows (load) and low voltages to lower real-time power output to ... - correct answersincrease
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
reactive power |||\\\
lowering the generator's current and increasing the voltage will also increase: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answersMVARs (reactive power) |||\\\ |||\\\
During reactive testing, which entity must give approval to change an approved voltage
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
schedule? |||\\\
PJM, TOP, MOC, GO - correct answersTO|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Generation available within 10 minutes for offline reserve units: |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Quick-start (hydro), manual, operating, supplemental - correct answersQuick-start (hydro)
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Minimum MVARs for an individual generator that is required to do reactive testing? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answers20 MVA |||\\\
Minimum MVARs for an aggregate of generators that is required to do reactive testing? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answers75 MVA |||\\\ |||\\\ |||\\\
Power transformer is connected to the generator with which line? - correct answersPrimary
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
In a balancing authority region, If a site trips offline, what increases? - correct answerspositive
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
time error |||\\\
How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answers6 hrs |||\\\ |||\\\ |||\\\
How does PJM avoid dealing with economic issues during transmission related constraints -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answerscost (offer) capping generation |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
If a generator doesn't have ICCP, what does it have to be linked through so data is available? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answersSCADA (through EMS) |||\\\ |||\\\ |||\\\ |||\\\
,Which balancing control mode is used by PJM under normal operations? - correct answersTie
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
line bias |||\\\
the purpose for balancing area to have AR (area regulator) is to correct for: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answerssmall deviations in load |||\\\ |||\\\ |||\\\
what esuite tool is used to maintain individual generator regulation data that is submitted by
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
PJM members? - correct answerseMarket
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\
cold weather alert is for what temp? - correct answers10F
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
what are the three types of transmission constraint that PJM monitors? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answersReactive, Stability, Thermal (transfer limits) |||\\\ |||\\\ |||\\\ |||\\\
which would be the last step PJM would take in attempting to relieve a transmission
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
constraint? - correct answersshed load |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Load in PJM is generally served using ___ transmission service. - correct answersNetwork
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Integration
If you were going to import, export, or wheel power through PJM, you would use ____
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
transmission services? - correct answerspoint-to-point? |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
what is an example of a quick start reserve? - correct answersHydroelectric
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
In order to lower system voltage, ___ must decrease to decrease _____ - correct answersMW,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
MVAR
, what is PJM's reg requirement during a system restoration? - correct answers2% of current
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
load
During restoration conditions, what amount of load must be shed in order to increase
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
frequency by 1.0Hz - correct answers6-10% |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
During restoration conditions, what percentage of load must be shed in order to alter
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
frequency by 1% Hz? - correct answers1-2% of load to alter frequency by 1% |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
What is the approx. MVAR per mile of 500kV transmission that should be anticipated? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answers1.70 MVAR per mile
|||\\\ |||\\\ |||\\\ |||\\\
Frequency during restoration process should be: - correct answers59.75-61Hz |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A system will blackout at what frequency? - correct answers57.5 Hz or lower
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
What is the criteria for PJM to issue a Min Gen Alert? - correct answersWithin 2500 MW of
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
normal eco min limits |||\\\ |||\\\ |||\\\
Based on a generator capability curve, in order to maximize the MVAR output of the generator,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
it may be necessary to: - correct answersdecrease MW output
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
It would be an acceptable action for PJM to request of a generator during periods of heavy
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
flows (load) and low voltages to lower real-time power output to ... - correct answersincrease
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
reactive power |||\\\
lowering the generator's current and increasing the voltage will also increase: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\