PJM exam with correct answers |||\\\ |||\\\ |||\\\ |||\\\




During reactive testing, which entity must give approval to change an approved voltage
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




schedule? |||\\\




PJM, TOP, MOC, GO - correct answersTO|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Generation available within 10 minutes for offline reserve units: |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Quick-start (hydro), manual, operating, supplemental - correct answersQuick-start (hydro)
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Minimum MVARs for an individual generator that is required to do reactive testing? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answers20 MVA |||\\\




Minimum MVARs for an aggregate of generators that is required to do reactive testing? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answers75 MVA |||\\\ |||\\\ |||\\\




Power transformer is connected to the generator with which line? - correct answersPrimary
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




In a balancing authority region, If a site trips offline, what increases? - correct answerspositive
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




time error |||\\\




How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answers6 hrs |||\\\ |||\\\ |||\\\




How does PJM avoid dealing with economic issues during transmission related constraints -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answerscost (offer) capping generation |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




If a generator doesn't have ICCP, what does it have to be linked through so data is available? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answersSCADA (through EMS) |||\\\ |||\\\ |||\\\ |||\\\

,Which balancing control mode is used by PJM under normal operations? - correct answersTie
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




line bias |||\\\




the purpose for balancing area to have AR (area regulator) is to correct for: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answerssmall deviations in load |||\\\ |||\\\ |||\\\




what esuite tool is used to maintain individual generator regulation data that is submitted by
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




PJM members? - correct answerseMarket
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\




cold weather alert is for what temp? - correct answers10F
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




what are the three types of transmission constraint that PJM monitors? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answersReactive, Stability, Thermal (transfer limits) |||\\\ |||\\\ |||\\\ |||\\\




which would be the last step PJM would take in attempting to relieve a transmission
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




constraint? - correct answersshed load |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Load in PJM is generally served using ___ transmission service. - correct answersNetwork
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Integration



If you were going to import, export, or wheel power through PJM, you would use ____
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




transmission services? - correct answerspoint-to-point? |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




what is an example of a quick start reserve? - correct answersHydroelectric
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




In order to lower system voltage, ___ must decrease to decrease _____ - correct answersMW,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




MVAR

, what is PJM's reg requirement during a system restoration? - correct answers2% of current
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




load



During restoration conditions, what amount of load must be shed in order to increase
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




frequency by 1.0Hz - correct answers6-10% |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




During restoration conditions, what percentage of load must be shed in order to alter
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




frequency by 1% Hz? - correct answers1-2% of load to alter frequency by 1% |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




What is the approx. MVAR per mile of 500kV transmission that should be anticipated? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answers1.70 MVAR per mile
|||\\\ |||\\\ |||\\\ |||\\\




Frequency during restoration process should be: - correct answers59.75-61Hz |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




A system will blackout at what frequency? - correct answers57.5 Hz or lower
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




What is the criteria for PJM to issue a Min Gen Alert? - correct answersWithin 2500 MW of
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




normal eco min limits |||\\\ |||\\\ |||\\\




Based on a generator capability curve, in order to maximize the MVAR output of the generator,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




it may be necessary to: - correct answersdecrease MW output
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




It would be an acceptable action for PJM to request of a generator during periods of heavy
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




flows (load) and low voltages to lower real-time power output to ... - correct answersincrease
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




reactive power |||\\\




lowering the generator's current and increasing the voltage will also increase: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answersMVARs (reactive power) |||\\\ |||\\\

Información del documento

Subido en
29 de agosto de 2025
Número de páginas
16
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
progrades
4.0
(2)
Vendido
17
Seguidores
0
Artículos
4053
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes