If a runway's pavement is without touchdown markings but has threshold markings
and aiming points.What type of approach is available on that runway?
A. Precision
B. Non-Precision
C. ILS Approach
Give this one a try later!
Non-precision
,Part 139 compliance is obtained by developing an Airport Certification _____________ if
approved by the FAA results in the issuance of an Airport Operating Certificate.
A. Book
B. Guide
C. Manual
D. Advisory Circual
Give this one a try later!
Manual
The Airport & Airway Improvement Act of 1982 created a new capital grant program
called the_____________________.
A. Airport Improvement Program
B. Airport Improvement Fund
C. Airport Improvement Money
D. Airport Improvement Group
Give this one a try later!
Airport Improvement Program
To be classified as a reliever airport under NPIAS, the airport must have at least how
many based aircraft.
A. 100
B. 25
C. 1,000
D. 1
Give this one a try later!
, 100
Which of the following is NOT a function of the Air Traffic Control System
Management Center (ATCSCC)?
A. Provides macro-level management of every aircraft in the NAS
B. Manages flow of traffic in the NAS
C. Provides air traffic control for individual flights in the NAS
D. Regulates flow of traffic into the NAS
Give this one a try later!
Provides air traffic control for individual flights in the NAS
What friction testing device is towed or installed in the rear of an operations vehicle?
A. Constant Friction Measuring Equipment (CFME)
B. Decelerometers (DEC)
Give this one a try later!
Constant Friction Measuring Equipment (CFME)
Airports that typically serve smaller aircraft tend to have multiple runways configured
in a crossing layout; while airports serving higher volumes of large aircraft tend to
have runways configured in a ___________________ layout.
A. Open V
B. Closed V
C. Parallel
D. Single
Give this one a try later!
and aiming points.What type of approach is available on that runway?
A. Precision
B. Non-Precision
C. ILS Approach
Give this one a try later!
Non-precision
,Part 139 compliance is obtained by developing an Airport Certification _____________ if
approved by the FAA results in the issuance of an Airport Operating Certificate.
A. Book
B. Guide
C. Manual
D. Advisory Circual
Give this one a try later!
Manual
The Airport & Airway Improvement Act of 1982 created a new capital grant program
called the_____________________.
A. Airport Improvement Program
B. Airport Improvement Fund
C. Airport Improvement Money
D. Airport Improvement Group
Give this one a try later!
Airport Improvement Program
To be classified as a reliever airport under NPIAS, the airport must have at least how
many based aircraft.
A. 100
B. 25
C. 1,000
D. 1
Give this one a try later!
, 100
Which of the following is NOT a function of the Air Traffic Control System
Management Center (ATCSCC)?
A. Provides macro-level management of every aircraft in the NAS
B. Manages flow of traffic in the NAS
C. Provides air traffic control for individual flights in the NAS
D. Regulates flow of traffic into the NAS
Give this one a try later!
Provides air traffic control for individual flights in the NAS
What friction testing device is towed or installed in the rear of an operations vehicle?
A. Constant Friction Measuring Equipment (CFME)
B. Decelerometers (DEC)
Give this one a try later!
Constant Friction Measuring Equipment (CFME)
Airports that typically serve smaller aircraft tend to have multiple runways configured
in a crossing layout; while airports serving higher volumes of large aircraft tend to
have runways configured in a ___________________ layout.
A. Open V
B. Closed V
C. Parallel
D. Single
Give this one a try later!