NERC Prep - Bal, Int, & Trans Exam Questions and Answers
b. NERC Operating Committee - What group can approve a change
L L L L L L L L L L
in the Disturbance Recovery Period for an Interconnection?
L L L L L L L L
a. NERC Interconnection Working GroupL L L
b. NERC Operating Committee L L
c. NERC Regional Council L L
d. NERC Disturbance Analysis Working Group
L L L L
c. Check targets and equipment - What is the first thing an operator should do after a
L L L L L L L L L L L L L L L L
relay operation?
L L
a. Check power system stabilizersL L L
b. Notify adjacent Transmission and Balancing areas
L L L L L
c. Check targets and equipment L L L
d. Notify their PSE that the transmission path is out of service
L L L L L L L L L L
c. Tie Lines - For the ACE equation to work properly, dynamic schedules, pseudo ties,
L L L L L L L L L L L L L L
frequency calculations, and all
L L L L L must be metered. L L
a. Communications
b. Transformers
c. Tie Lines L
d. Generation
c. Energy Emergency Alert Level I - What Energy Alert Level would the following
L L L L L L L L L L L L L
example be categorized as?
L L L L
"A Balancing Authority, Reserve Sharing Group, or Load Serving Entity foresees, or is
L L L L L L L L L L L L
experiencing conditions where all available resources are committed to meet firm
L L L L L L L L L L L
load, firm transactions, etc, and requests an Energy Emergency Alert."
L L L L L L L L L L
, a. Energy Emergency Alert Level IV L L L L
b. Energy Emergency Alert Level III L L L L
c. Energy Emergency Alert Level I L L L L
d. Energy Emergency Alert Level II L L L L
b. Implement the appropriate congestion management procedure. - You are a
L L L L L L L L L L
Reliability Coordinator in the Eastern Interconnection. A flow gate has become
L L L L L L L L L L L
overloaded because a parallel 345kV line has relayed out and part of that load has
L L L L L L L L L L L L L L L
transferred over to the flow gate causing an SOL and possible IROL violation. What
L L L L L L L L L L L L L L
would you do to relieve this violation?
L L L L L L L
a. Notify another Reliability Coordinator and ask them if they are having any
L L L L L L L L L L L
problem, and what should you do.
L L L L L L
b. Implement the appropriate congestion management procedure. L L L L L
c. Issue a Transmission warning to the Transmission Operators that lost the 345kV
L L L L L L L L L L L
line.
L
d. Place the line back in service within 30 minutes.
L L L L L L L L
b. Adjacent Balancing Authorities - Interchange schedules may be implemented
L L L L L L L L L
between
L L .
a. Source and Sink Balancing Authorities
L L L L
b. Adjacent Balancing Authorities L L
c. Sending, Receiving and Intermediate Balancing Authorities in the same Region.
L L L L L L L L L
d. Balancing Authorities in the same Interconnection. L L L L L
a. Frequency will continue to drop, generator governor response, decrease in load.
L L L L L L L L L L
- When the frequency of an Interconnection decreases due to the loss of a large
L L L L L L L L L L L L L L
generator, the
L L L until the combination of both
L L L L L
and
L L replace the output of the lost generator. L L L L L L
, a. Frequency will continue to drop, generator governor response, decrease in load
L L L L L L L L L L
b. Frequency will continue to drop, generator governor response, voltage
L L L L L L L L
regulating transformer response
L L L
c. Voltage will continue to raise, generator AVR response, voltage regulating
L L L L L L L L L
transformer response
L L
d. Voltage will continue to raise, generator AVR response, decrease in load
L L L L L L L L L L
a. That all involved reliability entities determined that there is no reliability
L L L L L L L L L L
problems with the Arranged Interchange. - In developing and setting up an
L L L L L L L L L L L L
Arranged Interchange, which of the following would transition the Arranged
L L L L L L L L L L
Interchange to the Confirmed Interchange status?
L L L L L L
a. That all involved reliability entities determined that there is no reliability
L L L L L L L L L L
problems with the Arranged Interchange.
L L L L L
b. The Department of Energy (DOE) made an in-depth study of the Interchange
L L L L L L L L L L L
Agreement and determined that it would have an adverse affect on the
L L L L L L L L L L L L
Interconnection.
L
c. There are available resources to meet the load.
L L L L L L L
d. All parties involved realized that they would not lose money for their company
L L L L L L L L L L L L
with this Interchange Agreement.
L L L L
b. He violated NERC standards - Early in the afternoon, a system operator notices that
L L L L L L L L L L L L L
frequency has dropped to 59.95Hz and his balancing area's ACE is 0. In order to
L L L L L L L L L L L L L L L
correct the under frequency condition, the operator pulses his generators to increase
L L L L L L L L L L L L
generation. Which statement best describes his actions?
L L L L L L L
a. He followed NERC guidelines
L L L
b. He violated NERC standards
L L L
c. He helped the system
L L L
d. He has not impacted the system
L L L L L
b. NERC Operating Committee - What group can approve a change
L L L L L L L L L L
in the Disturbance Recovery Period for an Interconnection?
L L L L L L L L
a. NERC Interconnection Working GroupL L L
b. NERC Operating Committee L L
c. NERC Regional Council L L
d. NERC Disturbance Analysis Working Group
L L L L
c. Check targets and equipment - What is the first thing an operator should do after a
L L L L L L L L L L L L L L L L
relay operation?
L L
a. Check power system stabilizersL L L
b. Notify adjacent Transmission and Balancing areas
L L L L L
c. Check targets and equipment L L L
d. Notify their PSE that the transmission path is out of service
L L L L L L L L L L
c. Tie Lines - For the ACE equation to work properly, dynamic schedules, pseudo ties,
L L L L L L L L L L L L L L
frequency calculations, and all
L L L L L must be metered. L L
a. Communications
b. Transformers
c. Tie Lines L
d. Generation
c. Energy Emergency Alert Level I - What Energy Alert Level would the following
L L L L L L L L L L L L L
example be categorized as?
L L L L
"A Balancing Authority, Reserve Sharing Group, or Load Serving Entity foresees, or is
L L L L L L L L L L L L
experiencing conditions where all available resources are committed to meet firm
L L L L L L L L L L L
load, firm transactions, etc, and requests an Energy Emergency Alert."
L L L L L L L L L L
, a. Energy Emergency Alert Level IV L L L L
b. Energy Emergency Alert Level III L L L L
c. Energy Emergency Alert Level I L L L L
d. Energy Emergency Alert Level II L L L L
b. Implement the appropriate congestion management procedure. - You are a
L L L L L L L L L L
Reliability Coordinator in the Eastern Interconnection. A flow gate has become
L L L L L L L L L L L
overloaded because a parallel 345kV line has relayed out and part of that load has
L L L L L L L L L L L L L L L
transferred over to the flow gate causing an SOL and possible IROL violation. What
L L L L L L L L L L L L L L
would you do to relieve this violation?
L L L L L L L
a. Notify another Reliability Coordinator and ask them if they are having any
L L L L L L L L L L L
problem, and what should you do.
L L L L L L
b. Implement the appropriate congestion management procedure. L L L L L
c. Issue a Transmission warning to the Transmission Operators that lost the 345kV
L L L L L L L L L L L
line.
L
d. Place the line back in service within 30 minutes.
L L L L L L L L
b. Adjacent Balancing Authorities - Interchange schedules may be implemented
L L L L L L L L L
between
L L .
a. Source and Sink Balancing Authorities
L L L L
b. Adjacent Balancing Authorities L L
c. Sending, Receiving and Intermediate Balancing Authorities in the same Region.
L L L L L L L L L
d. Balancing Authorities in the same Interconnection. L L L L L
a. Frequency will continue to drop, generator governor response, decrease in load.
L L L L L L L L L L
- When the frequency of an Interconnection decreases due to the loss of a large
L L L L L L L L L L L L L L
generator, the
L L L until the combination of both
L L L L L
and
L L replace the output of the lost generator. L L L L L L
, a. Frequency will continue to drop, generator governor response, decrease in load
L L L L L L L L L L
b. Frequency will continue to drop, generator governor response, voltage
L L L L L L L L
regulating transformer response
L L L
c. Voltage will continue to raise, generator AVR response, voltage regulating
L L L L L L L L L
transformer response
L L
d. Voltage will continue to raise, generator AVR response, decrease in load
L L L L L L L L L L
a. That all involved reliability entities determined that there is no reliability
L L L L L L L L L L
problems with the Arranged Interchange. - In developing and setting up an
L L L L L L L L L L L L
Arranged Interchange, which of the following would transition the Arranged
L L L L L L L L L L
Interchange to the Confirmed Interchange status?
L L L L L L
a. That all involved reliability entities determined that there is no reliability
L L L L L L L L L L
problems with the Arranged Interchange.
L L L L L
b. The Department of Energy (DOE) made an in-depth study of the Interchange
L L L L L L L L L L L
Agreement and determined that it would have an adverse affect on the
L L L L L L L L L L L L
Interconnection.
L
c. There are available resources to meet the load.
L L L L L L L
d. All parties involved realized that they would not lose money for their company
L L L L L L L L L L L L
with this Interchange Agreement.
L L L L
b. He violated NERC standards - Early in the afternoon, a system operator notices that
L L L L L L L L L L L L L
frequency has dropped to 59.95Hz and his balancing area's ACE is 0. In order to
L L L L L L L L L L L L L L L
correct the under frequency condition, the operator pulses his generators to increase
L L L L L L L L L L L L
generation. Which statement best describes his actions?
L L L L L L L
a. He followed NERC guidelines
L L L
b. He violated NERC standards
L L L
c. He helped the system
L L L
d. He has not impacted the system
L L L L L