• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 9 páginas
Examen

CET 2343 Exam 3 (final) Comprehensive Questions (Frequently Tested) with Verified Answers Graded A+

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

CET 2343 Exam 3 (final) Comprehensive Questions (Frequently Tested) with Verified Answers Graded A+

Vista previa del contenido

CET 2343 Exam 3 (final)
Comprehensive Questions
(Frequently Tested) with
Verified Answers Graded A+
According to ASTM C94 the concrete manufacturer should finish the purchaser a delivery ticket
with information about the location of the ready mix batch plant and truck number - Answer:
True



Materials for ready mixed concrete is batching by only volume - Answer: False



Liquid admixtures are batched by volume in fluid ounces - Answer: True



Powered admixtures are batched by volume in fluid ounces - Answer: False



What are the discharge time and revolution limits per ASTM C94 - Answer: 1.5 hours no
revolution limit



When ordering concrete the common practice has been to order ___ of concrete calculated
from form dimensions during construction - Answer: 3 to 10% more than the exact calculated
amount

, Concrete can be commonly transported from the batch plant to the job site using - Answer:
Ready mix truck



What are the two common types of concrete batch plants - Answer: Dry batch plant and central
batch plant



What is the difference between dry batch plants and central batch plants - Answer: Dry batch
mixes concrete in the truck and central batch uses a central mixers



What are the different equipment within a batch plant - Answer: Cement silo fly ash silo
aggregate bins batch house water tank and admixture tanks



From a dry batch plant a concrete mixture design can be commonly batched to the nearest 1 lb -
Answer: False



According to ASTM C94 how many revolutions must a ready mis truck turn for a dry batch plant
- Answer: 70



What is the place that monitors and controls the operation of concrete batch plant - Answer:
Batch house



If a ready mix truck is needed to arrive on the job site at 9am when should the ready mix truck
start loading if the job is a 25 minutes drive and it takes 10 minutes to load the ready mix truck -
Answer: 8:25



The common dry batch sequence of typical concrete mixtures has headwater of roughly 2/3 and
tail water of roughly 1/3 - Answer: True

Información del documento

Subido en
27 de julio de 2025
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
YourExamplug
4.1
(74)
Vendido
225
Seguidores
27
Artículos
18088
Última venta
1 semana hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes