• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 53 páginas
Examen

ACI Concrete Field-Testing Technician- Grade I Exam Prep (Latest 2025/ 2026 Update) Q/A | Grade A| 100% Correct (Verified Answers)

Document preview thumbnail
Vista previa 4 fuera de 53 páginas

ACI Concrete Field-Testing Technician- Grade I Exam Prep (Latest 2025/ 2026 Update) Q/A | Grade A| 100% Correct (Verified Answers) QUESTION The elapsed time between obtaining the first and final portions of a composite sample shall not exceed __ min. Answer: 15 min. QUESTION Portions of a composite sample shall be thoroughly mixed before beginning test on the sample. T/F Answer: True QUESTION Start tests for slump, temp, and air content within __ min. after obtaining the final portion of the composite sample. Answer: 5 min. QUESTION start molding specimens fr strength tests within __ after fabrication the composite sample. Answer: 15 min. QUESTION The concrete sample must be protected from contamination and __. Answer: Rapid evaporation QUESTION The maximum size sample for making strength test specimens is __ ft cubed Answer: 1 foot cubed. QUESTION When sampling from a STATIONARY mixer, the batch must be sampled at __ or more regularly spaced intervals during discharge of the middle portion of the batch. Answer: 2 QUESTION When sampling from a PAVING mixer, obtain samples from at least __ different portions of the pile and combine them into one composite sample for test purposes Answer: 5 QUESTION When sampling from a REVOLVING DRUM TRUCK mixer, sample the concrete by collecting __ or more portions taken at regularly spaced intervals during discharge of the middle portion of the batch. Answer: 2 QUESTION Concrete samples from a truck mixer will be obtained before any water or admixtures are added to the mixer at the job site. T/F Answer: False QUESTION The composite sample from a truck mixer must be obtained from the __ portion of the batch. Answer: Middle. QUESTION When the concrete contains aggregate larger than that permitted for a particular test method, the sample of concrete must be __ __ before making the test. Answer: Wet-seived QUESTION The slump test is applicable to plastic concrete with a maximum size aggregate of __. Answer: 1.5 " QUESTION The mold for making the slump is in the shape of __. Answer: Frustum QUESTION The height of the slump mold is __. Answer: 12" QUESTION The interior surface of the slump mold is allowed to have minor irregularities. F/T Answer: False QUESTION For use in the slump test, the end or both ends of the tamping rod must be __. Answer: Rounded QUESTION The sample of concrete for use in making the slump test must be obtained in accordance with ASTM standard __. Answer: C172 Section 2 QUESTION the slump mold should be in a dry condition before beginning the test. T/F

Vista previa del contenido

ACIl Concretel Field-Testingl Technician-l
Gradel Il Examl Prepl (Latestl 2025/l 2026l
Update)l Q/Al |l Gradel A|l 100%l Correctl
(Verifiedl Answers)

Q:l Thel elapsedl timel betweenl obtainingl thel firstl andl finall portionsl ofl al compositel
samplel shalll notl exceedl __l min.

Answer:
15l min.



Q:l Portionsl ofl al compositel samplel shalll bel thoroughlyl mixedl beforel beginningl testl
onl thel sample.l T/F

Answer:
True



Q:l Startl testsl forl slump,l temp,l andl airl contentl withinl __l min.l afterl obtainingl thel
finall portionl ofl thel compositel sample.

Answer:
5l min.



Q:l startl moldingl specimensl frl strengthl testsl withinl __l afterl fabricationl thel compositel
sample.

Answer:
15l min.

,Q:l Thel concretel samplel mustl bel protectedl froml contaminationl andl __.
Answer:
Rapidl evaporation



Q:l Thel maximuml sizel samplel forl makingl strengthl testl specimensl isl __l ftl cubed
Answer:
1l footl cubed.



Q:l Whenl samplingl froml al STATIONARYl mixer,l thel batchl mustl bel sampledl atl __l orl
morel regularlyl spacedl intervalsl duringl dischargel ofl thel middlel portionl ofl thel batch.

Answer:
2



Q:l Whenl samplingl froml al PAVINGl mixer,l obtainl samplesl froml atl leastl __l differentl
portionsl ofl thel pilel andl combinel theml intol onel compositel samplel forl testl purposes

Answer:
5



Q:l Whenl samplingl froml al REVOLVINGl DRUMl TRUCKl mixer,l samplel thel concretel
byl collectingl __l orl morel portionsl takenl atl regularlyl spacedl intervalsl duringl dischargel
ofl thel middlel portionl ofl thel batch.

Answer:
2



Q:l Concretel samplesl froml al truckl mixerl willl bel obtainedl beforel anyl waterl orl
admixturesl arel addedl tol thel mixerl atl thel jobl site.l T/F

,Answer:
False



Q:l Thel compositel samplel froml al truckl mixerl mustl bel obtainedl froml thel __l portionl
ofl thel batch.

Answer:
Middle.



Q:l Whenl thel concretel containsl aggregatel largerl thanl thatl permittedl forl al particularl
testl method,l thel samplel ofl concretel mustl bel __l __l beforel makingl thel test.

Answer:
Wet-seived



Q:l Thel slumpl testl isl applicablel tol plasticl concretel withl al maximuml sizel aggregatel
ofl __.

Answer:
1.5l "



Q:l Thel moldl forl makingl thel slumpl isl inl thel shapel ofl __.
Answer:
Frustum



Q:l Thel heightl ofl thel slumpl moldl isl __.
Answer:
12"

, Q:l Thel interiorl surfacel ofl thel slumpl moldl isl allowedl tol havel minorl irregularities.l F/T
Answer:
False



Q:l Forl usel inl thel slumpl test,l thel endl orl bothl endsl ofl thel tampingl rodl mustl bel __.
Answer:
Rounded



Q:l Thel samplel ofl concretel forl usel inl makingl thel slumpl testl mustl bel obtainedl inl
accordancel withl ASTMl standardl __.

Answer:
C172l Sectionl 2



Q:l thel slumpl moldl shouldl bel inl al dryl conditionl beforel beginningl thel test.l T/F
Answer:
False-l itl shouldl bel dampened



Q:l Thel surfacel onl whichl thel slumpl mosdl willl bel placedl mustl bel __.
Answer:
Ridged,l Flatl andl Level.



Q:l Thel slumpl moldl isl filledl inl __l layers
Answer:
3

Información del documento

Subido en
25 de julio de 2025
Número de páginas
53
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
nurse_steph
3.9
(1756)
Vendido
9881
Seguidores
5155
Artículos
8194
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes