When considering Cohesion and Coupling;
A. More cohesion and less coupling is better
B. More of both is better
C. Less of both is better
D. Less cohesion and more coupling is better
✓ -:- A. More cohesion and less coupling is better
Which one of the following is NOT a type of module cohesion?
A. Communicational
B. Sequential
C. Procedural
D. They are all types of cohesion
✓ -:- D. They are all types of cohesion
,View Oriented Requirements Definition (VORD) is based on the concept that requirements
are:
A. vague
B. manifested by the user interface (UI)
C. different for different users
D. new
✓ -:- C. different for different users
The distinct tasks to develop software are: A. code, compile, debug, and unit test.
B. requirements, design, code, test, integrate, and package.
C. design document, user guide, and test cases.
D. All of these are correct
✓ -:- A. code, compile, debug, and unit test.
Two types of prototypes can be done in design. They are:
A. Logical View, Detailed Design
B. Logical View, Process View
C. Low-fidelity, High-fidelity
D. Architecture Design, Detailed Design
✓ -:- C. Low-fidelity, High-fidelity
The term "Sunsetting" refers to:
,A. When all defects have been found and fixed in a product.
B. The point in the life of a product when a new replacement product or release is
announced.
C. When a programming team is finished and can turn over the product to maintenance.
D. None of the above
✓ -:- B. The point in the life of a product when a new replacement product or release is
announced.
Which one of the following is NOT true about phases of debugging process?
A. The process of correction involves changing the code to fix the errors.
B. The process of verification involves making sure the code is consistent with the
requirements.
C. The process of localization involves finding the sections of the code that led to the error.
D. The process of stabilization does not involve looking at the code at all.
✓ -:- B. The process of verification involves making sure the code is consistent with the
requirements.
The amount and extent of detail that must be included in the software requirements
specification (SRS) document depends on the
A. Knowledge and experience of the developers in the subject area.
B. Size and complexity of the project
, C. Both A and B
D. None of the above
✓ -:- C. Both A and B
Which of the following statements is true about "good" design?
Questions and Correct Detailed
Answers Graded A+
When considering Cohesion and Coupling;
A. More cohesion and less coupling is better
B. More of both is better
C. Less of both is better
D. Less cohesion and more coupling is better
✓ -:- A. More cohesion and less coupling is better
Which one of the following is NOT a type of module cohesion?
A. Communicational
B. Sequential
C. Procedural
D. They are all types of cohesion
✓ -:- D. They are all types of cohesion
,View Oriented Requirements Definition (VORD) is based on the concept that requirements
are:
A. vague
B. manifested by the user interface (UI)
C. different for different users
D. new
✓ -:- C. different for different users
The distinct tasks to develop software are: A. code, compile, debug, and unit test.
B. requirements, design, code, test, integrate, and package.
C. design document, user guide, and test cases.
D. All of these are correct
✓ -:- A. code, compile, debug, and unit test.
Two types of prototypes can be done in design. They are:
A. Logical View, Detailed Design
B. Logical View, Process View
C. Low-fidelity, High-fidelity
D. Architecture Design, Detailed Design
✓ -:- C. Low-fidelity, High-fidelity
The term "Sunsetting" refers to:
,A. When all defects have been found and fixed in a product.
B. The point in the life of a product when a new replacement product or release is
announced.
C. When a programming team is finished and can turn over the product to maintenance.
D. None of the above
✓ -:- B. The point in the life of a product when a new replacement product or release is
announced.
Which one of the following is NOT true about phases of debugging process?
A. The process of correction involves changing the code to fix the errors.
B. The process of verification involves making sure the code is consistent with the
requirements.
C. The process of localization involves finding the sections of the code that led to the error.
D. The process of stabilization does not involve looking at the code at all.
✓ -:- B. The process of verification involves making sure the code is consistent with the
requirements.
The amount and extent of detail that must be included in the software requirements
specification (SRS) document depends on the
A. Knowledge and experience of the developers in the subject area.
B. Size and complexity of the project
, C. Both A and B
D. None of the above
✓ -:- C. Both A and B
Which of the following statements is true about "good" design?