Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 8 páginas
Examen

JKO JT101 POST TEST 3 [ACTUAL EXAM] LATEST VERSION [QUESTIONS AND ANSWERS] WITH STUDY GUIDE DETAILED AND VERIFIED FOR GUARANTEED PASS- LATEST UPDATE 2025 GRADED A

Document preview thumbnail
Vista previa 2 fuera de 8 páginas

JKO JT101 POST TEST 3 [ACTUAL EXAM] LATEST VERSION [QUESTIONS AND ANSWERS] WITH STUDY GUIDE DETAILED AND VERIFIED FOR GUARANTEED PASS- LATEST UPDATE 2025 GRADED A

Vista previa del contenido

JKO JT101 POST TEST 3 [ACTUAL EXAM] LATEST VERSION
[QUESTIONS AND ANSWERS] WITH STUDY GUIDE
DETAILED AND VERIFIED FOR GUARANTEED PASS- LATEST
UPDATE 2025 GRADED A
Where will the operator find the Initialization Data Load (IDL) file assignment for their
platform? - CORRECT ANSWER OPTASK LINK

How does the U.S. Navy identify network designs? - CORRECT ANSWER JTIDS
Library Number (JNL) and Network Number

What is required for a Link 16 terminal to obtain coarse synchronization? - CORRECT
ANSWER Reception of one error free J0.0 Initial Entry Message (IEM)

Which of the following is true about an NTRE in an External Time Reference Network
(ETRN)? Select all that apply. - CORRECT ANSWER (NOT) Not necessary in an
ETRN to provide network stability / Required to establish an ETRN
(NOT) Behaves identically to a JUE once the network is established / not necessary in
an ETRN to provide network stability

Which of the following IS NOT a terminal interrupt? - CORRECT ANSWER Built-In
Test (BIT)

Where can the network time base for a Link 16 network be found? - CORRECT
ANSWER Network Description Document (NDD)

Correctly identify each segment of the NDD naming convention for USFU0020A. -
CORRECT ANSWER (NOT)
Country of origin: US
Originating NDF: F
Version Number: 00
National Use: A
Series Identifier: 20
Network Use: U

Which of the following are considered inputs of the Network Initialization step in the
Network Management System? Select all that apply. - CORRECT ANSWER
(NOT) Unique platform information / Initialization Data Load (IDL) file / Transmission
Sequence List

, Which of the following are considered inputs of the Network Planning step in the
Network Management System? Select all that apply. - CORRECT ANSWER
(NOT) Link 11 frequency assignments / Network Description Document (NDD) /
Locations of participants

What is required for a Link 16 terminal to PASSIVELY obtain fine synchronization? -
CORRECT ANSWER (NOT) Reception of three PPLI messages from the same
source

Match the correct J-Series Message category to the correct description. - CORRECT
ANSWER - J2.2: Air PPLI: Transmitted by airborne C2 and non-C2JUs
- J3.5: Land Point Track: Transmitted by C2JUs to report land points or tracks
- J28.2: Residual Message: Allows various Link 16 participants to send free text
messages among themselves
- J10.2: Engagement Status Message: Used by C2JUs to identify what tactical actions
are occurring
- J12.6: Target Sorting Message: Used by Non-C2JUs for target and targeting
information exchange
- J7.0: Track Management Message: Used by C2JUs to send Change Data Orders
(CDOs), send drop track message, and other track management actions

Which statement/statements regarding PPLIs is accurate? - CORRECT ANSWER
In RELNAV operations, a position quality of 15 is the most accurate

Correctly choose the data registration process and its description. - CORRECT
ANSWER - Geodetic Registration: Process in which a JTIDS/MIDS Unit (JU)
monitors and adjusts positional data with information derived through Relative
Navigation (RELNAV).
- Remote IU Registration: Compares local data to tracks received from a selected IU
and applies corrective values to positional data received from that IU.
- Sensor Registration: Process that corrects alignment of the sensor elements used for
the measurement of a tracked object's position.

Which of the following will link participants use the OPTASK LINK message for after
network operations have been established? Select all that apply. - CORRECT
ANSWER Maintain link operations / Resolve problems / Coordinate modifications

Which document will the JICO use to provide instructions on settings and procedures
about operational network entry and exit? - CORRECT ANSWER OPTASK LINK

Which of the following IS NOT responsible for the Link 16 network maintenance
functions? - CORRECT ANSWER Grid Reference Unit

Información del documento

Subido en
16 de julio de 2025
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CornelWest
3.7
(250)
Vendido
1573
Seguidores
1128
Artículos
12424
Última venta
2 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes