CQM-C CERTIFICATION QUESTIONS
AND CORRECT ANSSWERS
The70______70consists70of70daily70checks70of70the70work70to70assure70continuing70complianc
e70with70contract70requirements70-70ans-Follow-up70phase
Design-Build70contracts70require:70-70ans-
*The70QC70Manager70to70be70in70place70and70take70an70active70role70in70the70review70and70coo
rdination70of70the70design*
Which70of70the70following70is70included70in70all70three70phases70of70the70Three70Phases70of70C
ontrol70-70ans-Safety
The70purpose70of70Construction70Quality70Management70is70to70-70ans-
*Achieve70the70quality70established70by70properly70developed70requirements70through70the70
combined70responsibility,70but70separate,70efforts70of70contractor70and70Government70perso
nnel*
Testing70is70extremely70important70in70Construction70Quality70Management70and70is70perfor
med70by70-70ans-Both70the70contractor70and70the70Government
The70primary70purpose70of70the70Three-Phase70Control70System70is70to:70-70ans-
Require70the70contractor70to70plan,70schedule,70and70perform70quality70management70action
s70to70assure70work70meets70all70specified70quality70standards
Quality70Assurance70Personnel70have70the70responsibility70to:70-70ans-
*require70the70contractor70to70maintain70the70quality70specified70in70the70plans70and70specifica
tions*
the70____70is70the70appropriate70time70to70assure70that70all70materials70and/
or70equipment70have70been70tested.70submitted,70and70approved.70-70ans-
Preparatory70Phase
The70Preconstruction70Conference70and70the70Coordination70and70Mutual70Understanding70
Meeting70are:70-70ans-
conducted70prior70to70the70commencement70of70any70physical70construction70work
Contractor70testing70procedures:70-70ans-
are70specified70in70the70technical70specifications,70outlined70in70the70Quality70Control70Plan,70
and70addressed70at70the70Coordination70and70Mutual70Understanding70Meeting.
AND CORRECT ANSSWERS
The70______70consists70of70daily70checks70of70the70work70to70assure70continuing70complianc
e70with70contract70requirements70-70ans-Follow-up70phase
Design-Build70contracts70require:70-70ans-
*The70QC70Manager70to70be70in70place70and70take70an70active70role70in70the70review70and70coo
rdination70of70the70design*
Which70of70the70following70is70included70in70all70three70phases70of70the70Three70Phases70of70C
ontrol70-70ans-Safety
The70purpose70of70Construction70Quality70Management70is70to70-70ans-
*Achieve70the70quality70established70by70properly70developed70requirements70through70the70
combined70responsibility,70but70separate,70efforts70of70contractor70and70Government70perso
nnel*
Testing70is70extremely70important70in70Construction70Quality70Management70and70is70perfor
med70by70-70ans-Both70the70contractor70and70the70Government
The70primary70purpose70of70the70Three-Phase70Control70System70is70to:70-70ans-
Require70the70contractor70to70plan,70schedule,70and70perform70quality70management70action
s70to70assure70work70meets70all70specified70quality70standards
Quality70Assurance70Personnel70have70the70responsibility70to:70-70ans-
*require70the70contractor70to70maintain70the70quality70specified70in70the70plans70and70specifica
tions*
the70____70is70the70appropriate70time70to70assure70that70all70materials70and/
or70equipment70have70been70tested.70submitted,70and70approved.70-70ans-
Preparatory70Phase
The70Preconstruction70Conference70and70the70Coordination70and70Mutual70Understanding70
Meeting70are:70-70ans-
conducted70prior70to70the70commencement70of70any70physical70construction70work
Contractor70testing70procedures:70-70ans-
are70specified70in70the70technical70specifications,70outlined70in70the70Quality70Control70Plan,70
and70addressed70at70the70Coordination70and70Mutual70Understanding70Meeting.