• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 1 fuera de 2 páginas
Examen

Toc || 100% Solved Q&A!!

Document preview thumbnail
Vista previa 1 fuera de 2 páginas

Theory of Constraints correct answers Focuses on constraints/bottlenecks 3 Key Financial Performance Measures correct answers 1. Throughput 2. Inventory 3. Operating Expense Throughput correct answers Rate which manufacturing firm sells finished goods Not synonymous with production rate Inventory correct answers Money firm invested in purchasing things it intends to sell Operating Expense correct answers Cost of converting inventory into throughput New pie chart correct answers Labor cost becomes fixed cost and gets lumped with overhead Constraints correct answers Internal Resources -- bottleneck machine Market Related -- demand level Policy Related -- no work on weekends Procedure for dealing with constraints (5) correct answers 1. Identify primary constraint 2. Exploit constraint 3. Subordinate everything else to constraint 4. Elevate constraint 5. If constraint is eliminated, go back 10 Rules of TOC correct answers 1. Utilization + activation of resource are not synonymous 2. Level of utilization of non-bottleneck determined by other constraint 3. Hour lost in bottleneck is hour lost in system 4. Hour saved on non-bottleneck is mirage 5. Bottleneck governs throughput and inventory 6. Transfer batch size shouldn't = production batch size 7. Production batch size shouldn't be same in each stage of process 8. Capacity and priority considered together 9. Balance flow, not capacity 10. Sum of local optima doesn't equal optimum Resource Sequences correct answers Bottleneck prior to non-bottleneck Non-bottleneck prior to bottleneck Non-bottleneck and bottleneck prior to assembly stage Non-bottleneck and bottleneck independent Bottleneck prior to non-bottleneck correct answers Non-bottleneck should only run when available parts from bottleneck Non-bottleneck prior to bottleneck correct answers Non-bottleneck paced to match rate of bottleneck

Vista previa del contenido

TOC || 100% SOLVED Q&A!!
Theory of Constraints correct answers Focuses on constraints/bottlenecks

3 Key Financial Performance Measures correct answers 1. Throughput
2. Inventory
3. Operating Expense

Throughput correct answers Rate which manufacturing firm sells finished goods

Not synonymous with production rate

Inventory correct answers Money firm invested in purchasing things it intends to sell

Operating Expense correct answers Cost of converting inventory into throughput

New pie chart correct answers Labor cost becomes fixed cost and gets lumped with overhead

Constraints correct answers Internal Resources --> bottleneck machine
Market Related --> demand level
Policy Related --> no work on weekends

Procedure for dealing with constraints (5) correct answers 1. Identify primary constraint
2. Exploit constraint
3. Subordinate everything else to constraint
4. Elevate constraint
5. If constraint is eliminated, go back

10 Rules of TOC correct answers 1. Utilization + activation of resource are not synonymous
2. Level of utilization of non-bottleneck determined by other constraint
3. Hour lost in bottleneck is hour lost in system
4. Hour saved on non-bottleneck is mirage
5. Bottleneck governs throughput and inventory
6. Transfer batch size shouldn't = production batch size
7. Production batch size shouldn't be same in each stage of process
8. Capacity and priority considered together
9. Balance flow, not capacity
10. Sum of local optima doesn't equal optimum

Resource Sequences correct answers Bottleneck prior to non-bottleneck
Non-bottleneck prior to bottleneck
Non-bottleneck and bottleneck prior to assembly stage
Non-bottleneck and bottleneck independent

Bottleneck prior to non-bottleneck correct answers Non-bottleneck should only run when
available parts from bottleneck

Non-bottleneck prior to bottleneck correct answers Non-bottleneck paced to match rate of
bottleneck

Información del documento

Subido en
7 de julio de 2025
Número de páginas
2
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$8.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ProPerfomer
3.8
(84)
Vendido
450
Seguidores
322
Artículos
8858
Última venta
2 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes