——————- is the only factor in the universal soil loss equation which is beyond the
developers control - Answer-Rainfall erosion index
———————- are the factors most easily manipulated by the developer - Answer-Slope
length and gradient and cover factor
Inside the —————— water management district boundary you would run Tallahassee
construction projects - Answer-Northwest Florida
The requirements of the Florida NPDES construction genetic permit include posting a copy of
the NOI or acknowledgement letter, development and implementation of the SWPPP and
conducting inspections and retention of records - Answer-True
Which activities along with clearing grading and excavating are considered to also meet the
definition of construction activity - Answer-Demolition activities
The NPDES stormwater program regulates construction activities that disturb ——— or more
acres of land and discharges stormwater to surges waters of the state or an MS4 - Answer-1
acre
Construction projects in Miami fall within the boundaries of the ———— water management
district - Answer-South Florida
The operator has 30 days to update or revise the SWPPP when site conditions have
changed - Answer-False
Which of the following is required content for a SWPPP - Answer-A site map, a narrative
description, a signed and dated certification statement
During phase 1 of construction, even the smallest sites will require installation of ————
control practices prior to site development - Answer-Perimeter
During phase 2 of construction the components of the permanent ————— are constructed
and connected to the ————- - Answer-Stormwater system, stormwater facilities
Never device construction equipment near a live stream use storm sewers instead - Answer-
False
Apply ————— practices to protect the disturbed area from off site runoff and protect
offsite areas from sediment damage. - Answer-Perimeter control
Apply —————- practices to prevent excessive on site damage - Answer-Erosion control
——————- is the only factor in the universal soil loss equation which is beyond the
developers control - Answer-Rainfall erosion index
———————- are the factors most easily manipulated by the developer - Answer-Slope
length and gradient and cover factor
Inside the —————— water management district boundary you would run Tallahassee
construction projects - Answer-Northwest Florida
The requirements of the Florida NPDES construction genetic permit include posting a copy of
the NOI or acknowledgement letter, development and implementation of the SWPPP and
conducting inspections and retention of records - Answer-True
Which activities along with clearing grading and excavating are considered to also meet the
definition of construction activity - Answer-Demolition activities
The NPDES stormwater program regulates construction activities that disturb ——— or more
acres of land and discharges stormwater to surges waters of the state or an MS4 - Answer-1
acre
Construction projects in Miami fall within the boundaries of the ———— water management
district - Answer-South Florida
The operator has 30 days to update or revise the SWPPP when site conditions have
changed - Answer-False
Which of the following is required content for a SWPPP - Answer-A site map, a narrative
description, a signed and dated certification statement
During phase 1 of construction, even the smallest sites will require installation of ————
control practices prior to site development - Answer-Perimeter
During phase 2 of construction the components of the permanent ————— are constructed
and connected to the ————- - Answer-Stormwater system, stormwater facilities
Never device construction equipment near a live stream use storm sewers instead - Answer-
False
Apply ————— practices to protect the disturbed area from off site runoff and protect
offsite areas from sediment damage. - Answer-Perimeter control
Apply —————- practices to prevent excessive on site damage - Answer-Erosion control