Guidewire Associate Exam Questions and Answers |Complete Solutions Graded
A+ |100% Correct
What does Guidewire mean by Inception? Guidewire projects include an inception phase to
confirm
-- the scope of the project,
--produce an initial sizing, and
--create the project baseline.
What are the key objectives from Inception? 1. Formally kick off the project
2. Train the team on base product and methodology
3. Introduce the team to agile concepts
4. Determine an approach to address any product gaps
5. Document the high-level design (HLD) for integrations
6. Explain estimation changes as a result of the workshops
Who typically attends Inception? Product owners, SMEs, business analysts, developers, and
testers
Which criteria are used to prioritize the backlog? (In no particular order) Priority, value, size,
risk
What are the benefits of the Guidewire Community website? The Community is your one-
stop shop for information about Guidewire products. There are on-demand resources such as
software downloads, knowledge articles, and documentation. Also, this is where you can
contact Guidewire Customer Support by creating a case. You can also participate in the
Community through the discussion groups.
What is the naming convention for story cards? 1. xCenter with version
2. Theme
, 3. Sub-Theme / Screen
4. Guidewire ID
5 Common UI areas of all InsuranceSuite products Screen area
sidebar
tab bar
info bar
workspace
Business rules are used to create 1. Activities
2. Exposures
3. Reserves
What are the Business Rule Components? 1. Basic Information
2. Applicability criteria
3. Rule conditions
4. Rule actions
What are te logics those can be configured in PCFs? 1. Field behavior - visibility, availability,
editability
2. Screen behavior - add buttons, links, and menu items
Logic that can be configured in classes 1. New computed values or business logic
2. Non-dev document requirements for calculations or formatting changes
3. Dev writes code to implement requirement and tests it
What are Gosu classes based on? Business objects
A+ |100% Correct
What does Guidewire mean by Inception? Guidewire projects include an inception phase to
confirm
-- the scope of the project,
--produce an initial sizing, and
--create the project baseline.
What are the key objectives from Inception? 1. Formally kick off the project
2. Train the team on base product and methodology
3. Introduce the team to agile concepts
4. Determine an approach to address any product gaps
5. Document the high-level design (HLD) for integrations
6. Explain estimation changes as a result of the workshops
Who typically attends Inception? Product owners, SMEs, business analysts, developers, and
testers
Which criteria are used to prioritize the backlog? (In no particular order) Priority, value, size,
risk
What are the benefits of the Guidewire Community website? The Community is your one-
stop shop for information about Guidewire products. There are on-demand resources such as
software downloads, knowledge articles, and documentation. Also, this is where you can
contact Guidewire Customer Support by creating a case. You can also participate in the
Community through the discussion groups.
What is the naming convention for story cards? 1. xCenter with version
2. Theme
, 3. Sub-Theme / Screen
4. Guidewire ID
5 Common UI areas of all InsuranceSuite products Screen area
sidebar
tab bar
info bar
workspace
Business rules are used to create 1. Activities
2. Exposures
3. Reserves
What are the Business Rule Components? 1. Basic Information
2. Applicability criteria
3. Rule conditions
4. Rule actions
What are te logics those can be configured in PCFs? 1. Field behavior - visibility, availability,
editability
2. Screen behavior - add buttons, links, and menu items
Logic that can be configured in classes 1. New computed values or business logic
2. Non-dev document requirements for calculations or formatting changes
3. Dev writes code to implement requirement and tests it
What are Gosu classes based on? Business objects