QUESTIONS WITH 100%
ACCURATE SOLUTIONS ||UPDATED
2025/2026 BRAND NEW VERSION!!!
1. How long do you need to wait to reuse interchange tag numbers -
ANSWER ✓ 12 months
2. System restoration plans/procedures for simulation should be
tested and verified how often - ANSWER ✓ At least every 3 years
3. How often are blackstart resources required to be tested -
ANSWER ✓ At least every 3 years
4. TOP should verify through analysis of actual events, steady state,
and dynamic simulations/testing that the restoration plan
accomplishes intended function how often - ANSWER ✓ At least
every 5 years
5. BAL-002 default contingency reserve restoration period (following
disturbance recovery period) - ANSWER ✓ 90 minutes
6. How often should BA calculate and record inadvertent interchange
- ANSWER ✓ 60 minutes/hourly
7. How often should BA provide MW-hour meter readings to
adjacent BA's - ANSWER ✓ 60 minutes/hourly
, 8. TLR procedure (identifying TLR level and actions to be
implemented) needs updating how often - ANSWER ✓ 60
minutes/hourly
9. Hourly ATC for next 48 hours calculated how often - ANSWER ✓
60 minutes/hourly
10. During EEA2/3 the energy deficient entity needs to update
the RC how often until alert is terminated - ANSWER ✓ 60
minutes/hourly
11. DOE-417 (disturbance reporting) should be completed by
when - ANSWER ✓ 60 minutes
12. Zone 3 relays look at what percent of a line - ANSWER ✓
150%
13. Zone 2 relays look at what percent of a line - ANSWER ✓
120%
14. Zone 1 relays look at what percent of a line - ANSWER ✓
90%
15. CPS-1 compliance factor requirement - ANSWER ✓ at least
100%
16. DCS states that the BA should return ACE to 0 within the
recovery period for what percent of reportable disturbances -
ANSWER ✓ 100%
17. BA's frequency & ACE metering equipment should be
available with a minimum accuracy of 0.001Hz for what percent of
the year - ANSWER ✓ 99.5%