Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CEPSCI PRACTICE TEST|| 111 QUESTIONS AND ANSWERS 100% CORRECT

Puntuación
-
Vendido
-
Páginas
10
Grado
A+
Subido en
24-06-2025
Escrito en
2024/2025

CEPSCI PRACTICE TEST|| 111 QUESTIONS AND ANSWERS 100% CORRECTCEPSCI PRACTICE TEST|| 111 QUESTIONS AND ANSWERS 100% CORRECT 1972 clean water act - ANSWER-Administered by the US environmental protection agency (EPA) Created the NPDES 1972 clean water act - ANSWER-Administered by the US environmental protection agency (EPA) Created the NPDES 1987 - ANSWER-Amendment to CWA CALLED WATER QUALITY ACT NPDES in south carolina - ANSWER-South Carolina is NPDES delegated state. NPDES regulations are administered by - ANSWER-SCDHEC CGP authorizes - ANSWER-stormwater discharges from construction sites

Mostrar más Leer menos
Institución
CEPSCI
Grado
CEPSCI

Vista previa del contenido

CEPSCI PRACTICE TEST|| 111
QUESTIONS AND ANSWERS 100%
CORRECT
1972 clean water act - ANSWER-Administered by the US environmental protection
agency (EPA) Created the NPDES

1987 - ANSWER-Amendment to CWA CALLED WATER QUALITY ACT

NPDES in south carolina - ANSWER-South Carolina is NPDES delegated state.

NPDES regulations are administered by - ANSWER-SCDHEC

CGP authorizes - ANSWER-stormwater discharges from construction sites

Who must obtain NPDES coverage - ANSWER-land disturbing activities greater than or
equal to 1 acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone

NPDES permits are issued to - ANSWER-operator-person or company for a particular
discharge

primary permittee - ANSWER--has day to day operational control to ensure compliance
with SWPP
-typically the owner or developer

primary permittee responsibilites - ANSWER-submit NOI, Preparation of the C_SWPPP

Secondary permittee - ANSWER-individual lot owner or residential builder that conducts
land disturbing activity limited to an individual lot or group of lots as part of approved
LCP of development

De-watering inspection/maintenace - ANSWER-ongoing inspection is necessary in
order to detect any malfunctions or operation of equipment.
-Discharge areas should be inspected when other practices are inspected.

Buffer zones - ANSWER-Provide and maintain natural buffers around surface waters
during construction activities.

Buffers Maintenance - ANSWER-proper maintenance begins with flagging of the buffer
and includes proper inspection and maintenance of all BMPs discharging to the buffer
zone.

, Silt fence cannot be used for - ANSWER-velocity control

Erosion prevention BMPs - ANSWER--final stabilization
-Riprap for channel stabilization
-outlet protection
-Dust control
-Polyacrylamide (PAM)

Surface roughening DESCRIPTION - ANSWER-horizontal depressions, steps or
grooves that run parallel to contour of land

contractors - ANSWER-must on Contractor Certification- D-0437

On-Site SWPPP - ANSWER-SCDHEC CGP, NOI, NPDES coverage approval letter,
Contractor Certifications, Local Approvals, USACE approvals, Critical area
permit(coast)

OS_SWPPP - ANSWER-a copy of signed and certified SWPPP, NOI, and CGP
coverage letter from DHEC must be retained at site or electronically accessible

minor modification to ON-SWPPP - ANSWER-minor modifications made directly in the
field,do not need approval by DHEC- additional BMP's, removal of disturbed areas

major modifications to OS-SWPPP - ANSWER-must be made by qualified individual
and submitted to DHEC or appropriate delegated entity for approval

Phased plan requirement > 5 - ANSWER-include a phased stormwater management
plan which identifies all BMP's and grading work conducted during a specific portion of
the sites construction sequence. Each phase identified on at least one separate plan
sheet.

Phased plan requirement < 10 but > 5 acres - ANSWER-at least two separate plan
phases are required - initial land disturbance phase - stabilization phase

Phased plan requirement ≥ 10 acres - ANSWER-at least 3 separate plan phases are
required - initial land disturbance phase - construction phase - stabilization phase

All compliance inspection must include invesg. of, at a minimum of 5 of the following -
ANSWER-1. areas of site disturbed by construction activity and areas used for storage
of materials exposed to precipitation
2. stormwater conveyance systems for evidence of sediment
3. BMP's identified in OS-SWPPP
4. Discharge location to investigate if sediment leaving site, or if such locations are
inaccessible, nearby downstream location if possible.
5. Where vehicles enter or exit site for evidence of off-site sediment tracking.

Escuela, estudio y materia

Institución
CEPSCI
Grado
CEPSCI

Información del documento

Subido en
24 de junio de 2025
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$23.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Thumbnail
Package deal
CEPSCI CERTIFICATION (CERTIFIED EROSION PREVENTION AND SEDIMENT CONTROL INSPECTOR) EXAM PACKAGE DEAL (BUNDLE) WITH COMPLETE SOLUTIONS!!
-
15 2025
$ 50.99 Más información

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NursingTutor1 West Virginia University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1697
Miembro desde
3 año
Número de seguidores
1073
Documentos
18441
Última venta
6 días hace
Nursing Tutor

Paper Due? Worry not. Hello. Welcome to NursingTutor. Here you\'ll find verified study materials for your assignments, exams and general school work. All papers here are graded A to help you get the best grade. Also, I am a friendly person so, do not hesitate to send a message in case you have a query. I wish you Luck.

3.9

459 reseñas

5
217
4
79
3
92
2
21
1
50

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes